Sun, Jan 2, 2022 thru Sat, Jan 8, 2022
Sun, Jan 2, 2022
Jordan and I went to the Great Midwest Train Show at the DuPage County Fairgrounds in Wheaton IL today. Here's the treasures I found at the Train Show...
|
I broke down and bought another locomotive. It was an Athrean CNW SD45 only $80 AND included a decoder. The dealer even threw in the 85' flat car. |
|
Total Cost Breakdown: Pacific Fruit Express Refrigerated Box car: $12 Two Falcon Service trailers: $10 each or $20 CNW caboose: $7 Two CNW covered hoppers: $10 each or $20 85' flatcar and CNW SD45: $80 (Jordan paid $20) Total: $139 |
|
Instead of putting these cars through inspection, I'm going to go through the TEST run first and see how they perform. If there are "issues" I will put them through inspection. |
|
Here's the Train Order Sheet for tomorrow's TEST run. |
|
I also took some time to rewire the toggle for the isolated track at PRB West End. |
After I finished the wiring I tested it out and it failed!
UGH!
I'm going to ask Rob Fair to take a look tomorrow.
Mon, Jan 3, 2022
Train Day!
w/Rob Fair & Jordan Osborn
6-8pm 2 hrs.
|
Jordan greets us for the opening of our session tonight. |
I am running Train 5D and Jordan is running the Test Train
Duration: 00:00:30 sec.
Tue, Jan 4, 2022
This morning I was checking my email and received my Trains newsletter.
Right away, I noticed the GP9 shown here is a model I have downstairs.
|
Check this out. I downloaded the picture from the Trains Newsletter (probably illegal - Ywowza) and laid it beside my model. Pretty cool! |
Some minor clean up tonight and some work on the CNW Engine Facility.
|
Here's Jordan's test train from last night. Sometime this week I will put these cars where they belong. |
|
Since I'm adding the new locomotive to the SD40-2 (foreground bottom right corner), I needed to lengthen #2 Track at the CNW Engine Facility. |
|
The two buildings at the CNW Engine Facility used to be next to each other. After lengthening track #2 it has spread out the buildings and actually makes the engine facility look larger. It also allows the locomotives to be more "in view". |
I like the look better.
Wed, Jan 5, 2022
I put away the TEST Train cars tonight...
When I came downstairs and turned on the Command Station, I saw all the engines were lit up at both engine facilities...
|
Hard to tell in this shot, since the auto flash came on... |
|
This one is also hard to tell since I moved the phone taking the picture... |
|
You can "sort of" tell in this picture all the lights are on at the CNW Engine Facility. |
|
Now it's time to run the new locomotive on the new UT6 throttle. |
|
I've started to sort the cars. The first three cars are from Train 5C picking up the Green CNW Covered Hopper. |
|
Mission Accomplished. It's time to go back to the CNW Engine Facility and call it a day. |
|
Going back to Proviso Yard to see what I accomplished. I added two covered hoppers to the middle of Train 5C. |
|
I also added the UP Pacific Fruit Express car to the middle of Train 5D. |
|
I ran out of gas, so I will come back tomorrow and finish putting away the locomotive with it's paired locomotive CNW SD40-2 #6928 (patched) CNW Engine Facility Track #2 Power C2. |
I will also take a picture of the other car I put away - the 85' piggy-back flat car.
Thu, Jan 6, 2022
A promised picture of Global 2 and the new 85' flat car that passed the Test.
|
I'm not sure if the car is in the proper location, but you can see it on Track 1 Global 2. |
|
The two Engine Facilities caught my attention tonight so I thought I'd capture that in a picture. |
|
The Train Order Board is complete. It took from 11/23/21 (Line 1) thru 1/5/22 (Line 5) to complete the board. Next step: Clear the board and start over. |
Fri, Jan 7, 2022
Before running errands, I want to put the engines back in their resting places.
|
Here's where the new locomotive will be paired with the CNW SD40-2. CNW Engine Facility Track 2 Power C2. |
Next, I stopped by Rob Fair's home to drop off some supplies.
I also picked up a ground throw packet Rob picked up for me at B&G Train World
|
Still installing ground throws on the layout. |
Sat, Jan 8, 2022
Working on the RR...
No comments:
Post a Comment