Sun, Jan 16, 2022 thru Sat, Jan 22, 2022
Sun, Jan 16, 2022
I finished running the Piggy-back Train 2C and put it away at Global 2.
Piggy-back Train 2C highballing (75 mph on throttle UT6) thru Geneva IL
Duration: 00:00:30 sec.
I'm bound and determined to fix Switcher Engine UP GP50 #53 I need to re-code the decoder number from #03 to #53 and change the sound from steam to diesel. |
Piggy-back Train 2C back "home" at Global 2. |
A look at the layout from a distance. |
UP GP50 #53 Yard Switcher:
Mission Accomplished!
Duration: 00:00:35 sec.
Mon, Jan 17, 2022
Train Day!
w/Rob Fair and Jordan Osborn
6-8pm 2 hrs.
Rob worked on CNW SD40-2 #6928
Jordan and I worked worked on trouble-shooting the piggy-back train.
Opening discussion... |
This engine grinds and rumbles. Rob is going to figure out why tonight. |
Getting into the nitty gritty... |
Taking notes on trouble-shooting the Piggy-back train. |
Since all our throttles have lanyards, we adjusted the throttle holders to accommodate. |
Instead of putting the throttle into the slot, we'll hang them from the lanyard on the screw as you see here. |
Here's is one of the locations in use. |
One more at the Powder River Basin. |
Piggy-back Train 2C approaching trouble spot
Duration: 00:00:20 sec.
Unbelievable...I had all the train cars out of order
Duration: 00:00:31 sec.
Finally, approaching Kedzie trouble spot.
(Note one of the cars derailed at 3rd Street Geneva)
Duration: 00:00:16 sec.
Turns out we had another problem instead...
One of the cars derailed when the truck mount derailed off the sidewalk at 3rd Street Geneva. UGH! |
Back to another round of testing Piggy-back Train 2C,
now with cars in proper order.
Tue, Jan 18, 2022
Working on updating paperwork tonight...
I need to correct the two cars that were documented incorrectly. |
Wed, Jan 19, 2022
Finished editing the Index and filing the papers into the "Structures" binder
All my structure plans are in this red binder under PRB. |
Now it's time to put away the Piggy-back Train 2C until next month...
Closeup on the elevated section
Duration: 00:00:26 sec.
Piggy-back Train 2C approaching Proviso Yard and Global 2
Duration: 00:00:26 sec.
Rear end of train on Track 3 next is middle of train on Track 2
Duration: 00:00:31 sec.
And finally, the front of the Train on Track 1
Duration: 00:00:30 sec.
Last we see the Engine and caboose heading back to the Engine Facility CNW Track 2
Duration: 00:00:15 sec.
Thu, Jan 20, 2022
I got up a bit early this morning and did some cleaning up...
One of our meeting tables is in order. |
The workbench is a work in progress... |
The Powder River Basin table looks good. |
Finished a "tidy-up" and I like it. |
Finally, our main meeting table is looking good! Looks like the Control Tower could use a good cleaning up. |
I'll do that tonight.
Later that night...
I sweep the floor in the train room.
It looks so clean.
Here's proof in a video...
Duration: 00:00:37 sec.
Fri, Jan 21, 2022
Today I'm entertaining two people who came to my last train show.
They are...
Check this out...
Cadillac of all RR Transformers |
Another blurry picture. Makes me so mad! |
I've always wanted a transformer with a voltmeter and ammeter.
Sat, Jan 22, 2022
No train activity today.
No comments:
Post a Comment