Sun, Jan 23, 2022 thru Sat, Jan 29, 2022
Sun, Jan 23, 2022
Working on the RR...on a piggy-back 85' flat car...
|
It pays to keep the instructions. I have the parts, now I need to figure out how to install them... |
|
Putting the hitches together... |
|
...with the hitch plate. |
|
And then the install. |
|
Put a couple of trailers on the car and since this one is the largest number it will be the lead car going eastbound from track 1 nearest the elevated tracks. |
A little more work on the RR more at the Workbench...
|
Replacing the plastic wheels with metal wheels. |
|
This Train Car will go with Train 5A. When it's time to run this train we'll pick up this car and have a test run. |
|
Paperwork proceeds and will follow. The sheet on the left is the Maintenance Log and the Train Cars in Consist is on the right. |
|
One more car - also for Train 5A. I ran out of time, so only half the inspection was able to be completed. I'll try to finish up the inspection tomorrow. |
Mon, Jan 24, 2022
Train Day!
w/Rob Fair (Jordan Osborn and Milt Feryance still MIA)
6-8pm 2 hrs.
I must warn you it's pretty bad.
Tue, Jan 25, 2022
No train activity today.
Wed, Jan 26, 2022
|
Actual photo from Trains Cover photo of Powder River Basin |
|
My effort to get the same affect. |
Thu, Jan 27, 2022
No train activity today
Fri, Jan 28, 2022
I finished laying the ballast at the Powder River Basin West Yard...
Take a look...
|
Rob Fair did the dark ballast at the end. |
|
I sprinkled the new ballast over the dark and glued down the middle section. |
|
West Yard fully ballasted. |
Sat, Jan 29, 2022
More work at Powder River Basin...
|
Preparing to put down some ground foam... |
|
Gluing the base... |
|
Ground foam with clumps of foliage to match the environment. |
|
Time to move the Coal Train 2A and prepare for the return trip to Melrose Park Power Plant. |
|
More switching. |
I stopped here to pick up later today or even another day.
Later that day...
|
Even with a timer on my phone I still moved it during the actual take. I can't believe it. Any who - I'm starting to sort the coal cars from the East Yard to the West Yard to send back to Melrose Park Power Plant. |
|
Only a few more cars to move. |
|
Finished. Now I'm getting ready to put the train together for the return trip to Melrose Park Power Plant. |
Some switching maneuvers...
Duration: 00:00:23 sec.
I ran out of time to catch the End Of Train Device
Duration: 00:00:03 sec.
Final Lap for the East Bound Unit Coal Train 2A
Duration: 00:00:38 sec.
No comments:
Post a Comment