Sun, Apr 30, 2023 thru Sat, May 6, 2023
Sun, Apr 30, 2023
Filmed, Edited, Processed, Uploaded Monthly Layout Update
Mon, May 1, 2023
Train Day!
w/Rob Fair, Jordan Osborn and Marcus Thorsen
6-8:30pm 2.5 hrs.
![]() |
Starting off our evening with coffee and a planning session. |
![]() |
We'll be working on kitbashing the Oak Park - Marion Street Station. |
![]() |
Marcus Thorsen stopped by to take a look at the layout. He said, "Give me 30 minutes just to look." It may give him some ideas for his layout. |
![]() |
Jordan shows Marcus the display screen that shows the grade crossing signals at Melrose Park. |
![]() |
Rob is working on the tower pieces for the Oak Park - Marion Street station. |
Tue, May 2, 2023
![]() |
I stopped by JOANN fabrics to see if they might have some relief letters I could use for the tower letters. |
![]() |
I thought they may be a little too big, but I think this will work. |
![]() |
I also took some time to figure out how to display the tower clock. Prototype picture behind the model. |
![]() |
I'm pretty sure these are the final versions. |
![]() |
I paid $3.29 for these Sticker letters and then paid $.03 for City $.02 for District and $.21 for State. Total Cost: $3.55 |
![]() |
I took the same picture with a different backdrop. |
![]() |
Here's the two parts of the tower - clock and sign. |
Wed, May 3, 2023
![]() |
Tonight I'm going to shore up the joints on the station. |
![]() |
This picture shows the roof on the base of the steps. |
![]() |
Working on the tower. |
![]() |
Placing the tower in position. |
![]() |
I forgot to include this section so I'm reinforcing the floor to include the small piece I need to add. |
![]() |
Gluing the base before I put on the floor. |
![]() |
Gluing the base on the other side. |
![]() |
Time to wait for the weights. |
![]() |
I had to use weights on both sides of the station. |
I'm anxious to see what happens when I remove the weights tomorrow morning...
More to come...
Thu, May 4, 2023
![]() |
Here's my "workbench" where I put the model together. |
Here's a 360 view of the model
Duration: 00:00.32 sec.
Here's the model in place
Duration: 00:00.32 sec.
Talk about frustration!
My videos are fine, I can view them and move them from place to place and still view them.
However, when I upload to Blogger I can't view them.
What's up with that?
Fri, May 5, 2023
I didn't like the short tower, so I needed to add a section to make the tower taller...
![]() |
I worked over 1 hour on this to make the tower taller. |
Sat, May 6, 2023
Before heading downtown to James' Surprise 50th B-day party I worked on the RR...
![]() |
Now I'm trying to figure out how tall the glass panels should be... |
![]() |
Also working on details, like the 2nd floor railing around the side of the building. |
![]() |
I figured out how the glass panels would fit. I gut them and now I'm putting them in place to check the fit. |
![]() |
Another perspective. |
![]() |
I think the taller tower looks much better. |
![]() |
Cutting more parts for the roof section. |
![]() |
Starting to take shape. |
![]() |
I've actually notched out the two parts shown here in the middle of the photo. |
No comments:
Post a Comment