Week 257
Sunday, June 30, 2019 thru Saturday, July 6, 2019
Sunday, June 30, 2019
|
Rob Fair tests each LED street light with 3V power. |
|
Rob Fair replaces non-functioning overhead entry light at Union Station. |
|
Out with the old. |
|
In with the new. |
|
We also attached markers for our street lights & signals.
Yellow is for the traffic signals (13 & 14).
White is for the street lights (15). |
|
Another corner.
Traffic signals (11 & 12). |
|
Traffic Signal 9 and street light 10. |
|
One more corner. |
|
The final corner (4 of 4). |
|
Rob Fair tests the newly installed overhead street light at Union Station entrance. |
|
Now it's time to drill out the holes we just labeled for Street lights and traffic signals. |
|
What would we do without that long drill bit? |
|
We had to notch out the wood sections when the hole was over the 2 x 4. |
|
It was a little tight when the hole was near the hinge. |
|
A closer look at notching out the 2 x 4 to clear the wires for connecting to terminal blocks. |
|
Now Rob is drilling the holes for the fancy street lamps. |
|
Street lights in place, but not wired. |
Monday, July 1, 2019
SPECIAL GUESTS:
Mom & Dad, Neal, Geena, Christian, Alan & Becca
|
Lots of activity tonight.
Very fun time running trains. |
|
Taking in all the action... |
|
Geena poses as Neal and Becca tend to train details. |
|
Alan keeps his eye on the train and his hand on the throttle. |
UNIT Coal Train (Alan's train) in action.
Length: 00:00:30 sec.
|
Christian goes behind and gets a closer look. |
More fun watching trains.
Length: 00:00:17 sec.
Tuesday, July 2, 2019
NTA
Wednesday, July 3, 2019
No Train Day today. Cam is camping and Jordan is gaming.
|
I did spend a little time putting on new track bumpers - with lights. |
|
Here are two of them. |
Thursday, July 4, 2019
Adding ground throws and working on switches in the engine terminals and Proviso Yard.
|
I'll add a ground throw here. |
|
And there... |
|
Here it is. |
|
And there it is. |
|
I also added the switch machine to the right of the ground throw. |
|
Plus I added the station platform ID - blue Metra signage. |
|
Close up from the other direction. |
|
Next up is adding the skirt.
BEFORE |
|
AFTER. |
Friday, July 5, 2019
NTA
Saturday, July 6, 2019
Taking a look at the floor lighting during night runs.
Length: 00:00:31 sec.
|
Testing rope lighting to see if the floor illumination is sufficient.
The scene is looking east to Chicago. |
|
This scene is looking west towards Kedzie towards California Ave Metra Yard.
You can see the CNW Powerhouse to the right at Milwaukee Avenue. |
No comments:
Post a Comment