Week 256
Sunday, June 23, 2019 thru Saturday, June 29, 2019
Sunday, June 23, 2019
Today I took one hour out of my schedule and reworked the RIP tracks.
Here's what I did...
|
First, I had to remove the Snap Switch which is a 18 degree radius.
Too much! |
|
Removing the Snap Switch and installing the #6 right hand primary switch off the mainline will move all the tracks to the left. |
|
I had to move the secondary switch closer to the main. |
|
Next, I added the tertiary switch. |
|
Then I had to line up the switches to the RIP repair shop and the holding test track under the bridge. |
|
Same picture different view. |
|
Here's the view from the mainline. |
|
Adding the ground throws to their new locations. |
|
Finished product. |
|
Same picture different view. |
Monday, June 24, 2019
Train Day!
with Rob Fair and Jordan Osborn
6-7:30pm 1.5 hrs.
|
Rob Fair will work on the Union Station lighting project. |
|
Jordan Osborn will main the control tower and offer assistance as needed. |
|
Rob Fair getting into the guts of Union Station. |
|
Jordan Osborn and I worked on re-gluing some items to the condominium skyscraper. |
|
Showing off the lights, oh oh, can't see with the flash.
Take it again without the flash. |
|
OK, here you go.
Without the flash. |
|
And from the front of Union Station. |
Tuesday, June 25, 2019
NTA
Wednesday, June 26, 2019
Action footage of the unit coal train.
Length: 00:00:30 sec.
|
The Unit Coal train curing through the West and South Power Districts. |
|
Cam Passaglia and Jordan Osborn having fun running trains. |
Thursday, June 27, 2019
Widening the mainline track at Oak Park Marion St. / Lombard Stations Stop
|
Since the new station platform was too large for the existing mainline track, I needed to extend the mainline a bit.
First thing to do was to put another layer of cork on the outside of the track.
Here the clamps are securing the cork to the glue for overnight setting. |
|
Another perspective - opposite direction.
Tomorrow I'll take another picture with the clamps removed and the extension shown more clearly. |
Friday, Jnne 28, 2019
|
More work on Oak Park / Lombard station stop and widening the mainlines to make room for the new station platform. |
|
I had to extend the outer mainline and add a piece track to make it happen.
See tomorrow's blog entry. |
Saturday, June 29, 2019
Finishing 3 day Project:
|
After adding the mainline cork now it's time to put in the track extension. |
|
At first, I thought all I thought I needed was about this much more space. |
|
However, after testing the clearance, I needed to spread the mainline a bit more... |
|
...so this is the piece I had to install to make the clearance work. |
|
Here's the test car in place.
The commuter coach was also used as a test car (out of sight). |
No comments: