Sun, Nov. 1, 2020 thru Sat, Nov. 7, 2020
This week's goals:
1. Finish chain-link fence around Power Plant Substation.
2. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
3. Test out Digitrax UT4 finally returned to me
Sun, Nov. 1, 2020
 |
I tried to finish up the horizontal lines during the Bears game today, but failed miserably. The top line came off, so I need to re-glue. UGH! |
Mon, Nov. 2, 2020
Train Day!
with Rob Fair and Jordan Osborn
6-8pm 2 hours
Here's what we accomplished...
Tue, Nov. 3, 2020
 |
Trying to hinge the gate and get the chain-link attached.
|
 |
Not bad, I think it may work.
|
 |
Finished the gate side. Now on to the other sides... |
Wed, Nov. 4, 2020
No train activity today.
Thu, Nov. 5, 2020
Jordan Osborn stopped by tonight for some work on the RR:
 |
I finished laying the switch I bought from B&G Train World Hobby Shop today. |
 |
Here's the empty unit coal train from the Power Plant in Melrose Park ready to be loaded and then return to Melrose Park to generate more electricty.
|
This special edition of Season 1 shows an empty unit coal train leaving the Melrose Park Power Plant heading to the Powder River Basin. Once at the Powder River Basin the train will be loaded with more coal and return to the Power Plant in Melrose Park.
I also had another ulterior motive: Test every input to each UP5 using my new UT4.
Fri, Nov. 6, 2020
There were two spots I had to repair so I'll try to put them side-by-side
and show you the repair progress:
First I cut out the sections that I will use to repair these spots.
After cutting out the "debris" I fit the cut-out pieces into place.
Once I was satisfied with the fit, I put down some glue.
Now you can see how nicely the cut-out pieces fit in place.
 |
Finally, I had to put weights on top and will wait for the glue to set (usually overnight). |
One more thing...
Length: 00:00:30 sec.
Finished Goal #1
 |
Substation in place. Now I need to put down the base and make sure the lift off section fits securely. |
 |
Another view of the finished substation.
|
Sat, Nov. 7, 2020
I had some time to work on the base of the Power Plant...
 |
This is the base of the Power Plant.
|
 |
My plan is to secure a layer of "asphalt" on top. First, I apply the foam adhesive. |
 |
Spread it around about the same thickness.
|
 |
I'll use the boards for the base of the weights.
|
 |
With the weights in place now we wait overnight.
|
The cousins came over tonight and found Rob Fair's Thomas the Tank Engine sound machine.
Here they are dancing a jig to the sounds made by the device Charlie is holding.
Also included in the dance are Josiah and Ida.
Length: 00:00:28 sec.
This week's goals recap:
1. Finish chain-link fence around Power Plant Substation.
Progress: DONE! Fri, Nov. 6, 2020
2. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
Progress: None
3. Test out Digitrax UT4 finally returned to me
Progress: DONE! Tested every input Thu, Nov. 5, 2020