Sun, Nov. 8, 2020 thru Sat, Nov. 14, 2020
This week's goals:
1. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
Progress: Not Started
2. Finish lighting at Melrose Park Power Station
Progress: Working on it.
3. Start work on CNW Power Plant
Progress: Lots of thinking, no action yet
Sun, Nov. 8, 2020
![]() |
In order to light up the Power Plant we need to do some leg work to get the footprint ready. Step 1: Lay down the "asphalt" base |
![]() |
Another view... |
![]() |
And another view... |
![]() |
Power plant lights installed. First row of parking lot lights installed. |
![]() |
Checking building placement over lighting. |
Mon, Nov. 9, 2020
![]() |
Rob Fair checking light fixtures making sure they are working before we install them. |
![]() |
Rob Fair and Jordan Osborn Jordan stopped by for a cameo appearance. |
![]() |
Removing the "footprint" in order to begin the lighting. |
![]() |
The top of the washing machine turned out to be a great place for our work place. |
![]() |
Rob Fair glues in the light posts to keep them in place while we place the footprint on its side for wiring. |
![]() |
Hard to see the wires, but they're there. |
![]() |
Rob Fair preparing the connections. |
![]() |
We finished wiring up the street lights in parallel circuit. |
Tue, Nov. 10, 2020
![]() |
The building lights are all connected. Street lights on the left, building lights on the right. |
![]() |
Then I put electrical tape and thumbtacks to keep the wires in place so they won't get caught when putting the "footprint" back in place. |
![]() |
Ready to put back in place... |
This afternoon I was able to get the wires
![]() |
Now we're ready for the structures. |
![]() |
Structures in place with working lights. |
![]() |
Better looking in person. I hope to see you soon! |
Finished Goal #2!
Wed, Nov. 11, 2020
![]() |
After I figured out all the underside wiring, here's how it looks on the top side. Coal train waiting for unloading and lights working inside the power plant and substation. |
Thu, Nov. 12, 2020
Fri, Nov. 13, 2020
![]() |
Copper tubing, Spade terminals, balsa wood. |
![]() |
Here's the cost for CNW Power House Project |
![]() |
I like to work at the dining room table because there's lots of light. Watch as the table fills up with tools and other stuff. |
![]() |
I found my kitbashing materials. Getting ready to start installing the base...keep watching... |
You'll need to go to Week 329 for the progress on this project.
Sat, Nov. 14, 2020
Progress report on this week's goals:
1. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
Progress: Not Started
2. Finish lighting at Melrose Park Power Station
Progress: DONE! Finished Wed, Nov. 11, 2020
3. Start work on CNW Power Plant
Progress: Officially restarted this week (Fri, Nov. 13, 2020)