Tuesday, November 10, 2020

Week 328

 Sun, Nov. 8, 2020 thru Sat, Nov. 14, 2020

This week's goals:

1. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave. 

Progress: Not Started

2. Finish lighting at Melrose Park Power Station 

Progress: Working on it.

3. Start work on CNW Power Plant

Progress: Lots of thinking, no action yet


Sun, Nov. 8, 2020

Progress on Goal #2
In order to light up the Power Plant we need to do
some leg work to get the footprint ready.
Step 1: Lay down the "asphalt" base


Test the location of the power plant and substation.

Another view...

And another view...

Power plant lights installed. First row of parking
lot lights installed.

Checking building placement over lighting.


Mon, Nov. 9, 2020

Train Day!
with Rob Fair 6-8:15pm 2.25 hrs.
Rob Fair checking light fixtures making sure they
are working before we install them.

Rob Fair and Jordan Osborn
Jordan stopped by for a cameo appearance.

Removing the "footprint" in order to begin the lighting.

The top of the washing machine turned out to be
a great place for our work place.

Rob Fair glues in the light posts to keep them in
place while we place the footprint on its side for wiring.


Getting ready to wire up the light fixtures.

Hard to see the wires, but they're there.

Rob Fair preparing the connections.

We finished wiring up the street lights in parallel circuit.

Tue, Nov. 10, 2020

I got up early this morning and finished wiring 
the building lights.
The building lights are all connected.
Street lights on the left, building lights on the right.

Then I put electrical tape and thumbtacks to keep
the wires in place so they won't get caught when
putting the "footprint" back in place.

Ready to put back in place...

This afternoon I was able to get the wires 
hooked up to the power source underneath the layout.
Now we're ready for the structures.

Structures in place with working lights.

Better looking in person.
I hope to see you soon!

Finished Goal #2!

Wed, Nov. 11, 2020

Video of Goal #2 completed:
Length: 00:00:33 sec.

After I figured out all the underside wiring, here's
how it looks on the top side. Coal train waiting for
unloading and lights working inside the power plant
and substation.

Thu, Nov. 12, 2020

Just made some notes on how many switches I'll need at Powder River Basin, Global 2 and the Industrial Park.

Here's the list:

Powder River Basin
#4 R 3
#4 L 2
#6 L 2

Global 3
#4 L 1

Industrial Park
#4 R 1
#4 L 3

Totals
#4 R 4
#4 L 6
#6 L 2

Fri, Nov. 13, 2020

After subbing today I stopped by ACE to pick up some supplies for a project I'm working on...
Copper tubing, Spade terminals, balsa wood.

Here's the cost for CNW Power House Project

I like to work at the dining room table because
there's lots of light.
Watch as the table fills up with tools and other stuff.

I found my kitbashing materials.
Getting ready to start installing the base...keep watching...

You'll need to go to Week 329 for the progress on this project.

Sat, Nov. 14, 2020

No train activity today.

Progress report on this week's goals:

1. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave. 

Progress: Not Started

2. Finish lighting at Melrose Park Power Station 

Progress: DONE! Finished Wed, Nov. 11, 2020

3. Start work on CNW Power Plant

Progress: Officially restarted this week (Fri, Nov. 13, 2020)

Check out next week (Week 329)


No comments:

Post a Comment