Monday, September 28, 2026

Week 635

Sun, Sep 27, 2026 thru Sat, Oct 3, 2026

Sun, Sep 27, 2026

I finally wired up the lights at Washington Street.
Making progress, now I need to install the Servo motors to work the gates.
I also will need to wire up the end lights which will take some soldering
under the layout.

Mon, Sep 28, 2026

Train Day!
w/Rob Fair 6-8:15pm 2.25 hrs.

I started the session about 20 minutes early.
Rob is working on his first assignment...

...checking the Mixed Freight 5C consist.

All set!
On to the next assignment.

Rob and I will work in tandem to get the loaded hopper cars
moved from the East Yard to the West Yard...

The first leg of the three leg assignment is complete.

We finished moving the cars and building the EB Unit Coal Train
and now Rob is the engineer of the EB Unit Coal Train headed
for the Melrose Park Power Plant.

You can see this train in action in the weekly update YouTube
video located in the link under Saturday's entry.

I'm running the Unit Coal Train now under Rob's careful eye
at the dispatcher's command center.

The Powder River Basin Yards both empty and ready for more
the return of the empties from Melrose Park Power Plant.

We worked until about 8:20pm.

Here's the loaded cars at the Melrose Park Power Plant from
the Powder River Basin return trip.

Tue, Sep 29, 2026

Some very special guests came to visit tonight.
This is Ann and Charlie. Charlie is a dear high school friend
I haven't seen for over 40 years. Yikes!

I added Charlie to the engineer list so he will be considered
"vested" in my railroad. Not just a casual observer.

Wed, Sep 30, 2026

Early this morning...

Look what came in the mail last night.
There are 8 sensors and 8 1x2 cables.

Tonight I will map out using the red cones where each sensor
should be located for EB and WB trains.

After I figure out where the sensors should be located,
I will update the design sheets (I'll take a picture later).

Here are the sensor locations at Wheaton - S. West Street crossing.

The WB sensor locations at the Melrose Park S. 19th Street crossing.

WB and some of the EB sensor locations at Melrose Park -
S. 19th Street crossing.

I am currently working at this location. This is at the
West Chicago Washington Street crossing.

Later this evening...

My starting point for tonight.

My first sensor installed.

My first sensor installed - a look from under the layout.

The second sensor installed as seen from under the layout.

That took about 67 minutes.

Thu, Oct 1, 2026

No train activity today.

Fri, Oct 2, 2026

My starting point tonight...

It took me a while just to figure out how to get started.

Once I figured that out I started drilling out the holes for the sensors.

My third sensor installed. This is for the WB line near the crossing.

And this one is for the EB line near the crossing on the other side.

That took about 51 minutes. Installed two sensors.
This is going to take some time doing all 5 crossings.

As I get better it will go faster.
Right now, I'm figuring out how to get it done.
Once I get that figured out it will go much faster.

Sat, Oct 3, 2026

As promised, here's the updated diagram of where the sensors
will go for each of the 5 locations on the railroad.

The red cones mark where the sensors will be located under
the layout. This is Washington Street, West Chicago.

To determine where the cones are located from under the layout
I used plastic tubes with red markings to show WB and blue
markings to show EB.

This morning's session was about 1 hr. This afternoon's sessions
will begin at 1:40pm.

Still working on installing the sensors from under the layout.

Making progress...

Fixing a plastic piece that fell away months ago.

The EB cones in view in this photo.

That took just under 1 hr. from 1:40-2:33 53 mins. to be sure.

I finally got them working, but I don't know how...

...I turned on the system and they just started working. One
of the sensors are buried and activated the working signals.


to view Weekly Layout YouTube video Update
Duration: 12:49 min:sec

Description

What's ON Track this Week?

*1st display of WeHonest Railroad Gate Crossing System
*Monday night train session happenings
*AmTrak Train 1F running with Special Guest, Charlie
*Using Red Cones to mark where the sensors will be placed
*Washington Street West Chicago sensors installed
*Thanks for watching and providing your feedback!

No comments:

Post a Comment