Sun, Mar 15, 2026 thru Sat, Mar 21, 2026
Still working on switches (#4 & #5) at the Industrial Park
![]() |
| This picture shows the piece I added to the switch arm that will hold the activator of the switch machine to move the switch from main to divergent |
![]() |
| This is the other switch belonging to the crossover which shows how I attached it to the foam underneath |
![]() |
| I took this picture to show the hole I drilled at the end of the bridge to the right side. |
![]() |
| I drilled out the hole for the wires for this switch machine too. |
![]() |
| The time shows 0:59 but I had a 15 min. phone conversation so the time spent on the RR tonight was .75. |
Mon, Mar 16, 2026
TRAIN DAY! FINALLY!
w/Rob Fair 6:30-8pm 1.5 hrs.
Guests:
What we did...
![]() |
| Moving Commuter Cars from Chicago Terminal to the California Ave Metra Commuter Facility Coach Yard |
![]() |
| The two stars of the show tonight. GP-15 #1812 and SW1500 #1064 |
![]() |
| Oops! We didn't finish the end of the line supports. Major failure, but fixable! Whew! |
![]() |
| Next move is at the Powder River Basin...moving coal cars from the East Yard to the West Yard |
![]() |
| Main Power locos waiting to take the Unit Coal Train back to the Melrose Park Power Plant |
![]() |
| Almost finished. Only need to switch 10 more cars. |
![]() |
| Moving last set of cars into the West Yard Track 2 |
![]() |
| Rob handled the West Yard while I assisted him in the East Yard. |
You can view the action from tonight
in the Weekly YouTube Layout Update video found
in Saturday's entry at the bottom of this blog.
in the Weekly YouTube Layout Update video found
in Saturday's entry at the bottom of this blog.
Tue, Mar 17, 2026
Paperwork catch up day...
![]() |
| Updating the Performance page in the spreadsheet |
![]() |
| I also need to redo the manifest sheet for this process. I need to make it much simpler. Right now the process is on two sheets, I need to put it all on one sheet. |
Wed, Mar 18, 2026
Finished paperwork...Train Performance & Train Cars in Consist (the Train Manifest)
![]() |
| AFTER This sheet is more reflective of what the job requires, and much easier to follow. |
Thu, Mar 19, 2026
No train activity today.
Fri, Mar 20, 2026
Visit to Tom Stover's Elburn IL operating session...
![]() |
| Tom leads the charge. Shown left to right: Alan, Tom, Dave, Jon. |
![]() |
| Dave is working Denver Yard. Jon is running the milk train. |
![]() |
| Glynn is the final member of today's crew. He is working Grand Junction. |
Later that evening...
![]() |
| I'll be working under the layout. |
![]() |
| Running wires to feed crossover switch #5 in the Industrial Park. |
![]() |
| Here are the two wires coming down from the switches. |
![]() |
| As I move to the top of the layout, here are the two sets of wires coming up from the bottom to Crossover Switch #5. |
Next up:
Connect the 2 sets of wires to the switch machines, and then,
connect the wires together under the layout to switch controller #5
I hope to get that done tomorrow.
But, we'll see. Lots going on tomorrow...
Sat, Mar 21, 2026
Almost done with Crossover Switch #5, but not quite...
![]() |
| First thing is to extend the wires to one of the switch machines. |
![]() |
| Next, I used shrink wrap to keep the wires from touching one another and causing a short |
![]() |
| Finally, I inserted a larger straw to use as a conduit for the wires to fit through the layout base. |
I did wire the switches and tested them and they work...sort of...
but I still need to solder the connections because I don't think
they worked too good because of the temporary wire job I did.
to view YouTube video of the Weekly Layout Update
Duration: 10:32 min/sec
Description
What's ON Track this week?
*Intro
*Monday night's train session
*Visit to Tom Stover's Elburn IL
*Finished wiring the switches at the Industrial Park
*That'll do. See you next week.
*Thanks for watching!