Sun, Apr 9, 2023 thru Sat, Apr 15, 2023
Sun, Apr 9, 2023
Easter/Resurrection Sunday
and my birthday!
|
Getting ready for tomorrow's Train Day... cutting out the parts from the sprue. |
|
Some major cutting for these parts to make them fit. |
Mon, Apr 10, 2023
Train Day!
w/Rob Fair, Marcus Thorsen & Jordan Osborn
6-8pm 2 hrs.
|
I'd like to locate where the light poles will be installed... |
|
Another view of the possible locations for the light poles at the CNW Engine Facility |
|
Now for the UP Engine Facility possible light pole locations. |
|
I will have Rob Fair located these tonight. |
|
Maybe we'll have some time to figure out the Urban Steel Overpass for Marion Street Oak Park. |
|
Rob Fair gave me these two red tractor trucks as my birthday gift. Thanks Rob! |
|
Our opening session. Marcus wrote a paper about the Bible aimed at understanding for a 13 year old. |
|
Rob has a map of Japan and his experience on a bullet train when he was there a few years back. |
|
More group discussion... |
|
Time to run some trains. Marcus will take the lead on Mixed Freight 5D led by CNW C44-9W #8718 and MU'd with #8659 |
|
Rob Fair locating and drilling out the holes for the Engine Facility light poles. |
|
Marcus working on his 2nd lap. |
|
Dispatcher Jordan keeping his eye on the train as well. |
Mixed Freight 5D coming around the bend -
East Power District
Duration: 00:00.31 sec.
|
Rob drilling out the holes for the light poles. |
Rob Fair in action...
Duration: 00:00.21 sec.
Tue, Apr 11, 2023
Continuing the work Rob started yesterday...
|
After putting "straws" in all the holes, I determined these were the best holes for the lights I will install. |
|
Another view of the UP Engine Facility light set up. |
|
I ran out of straws, but I will cut these in half and finish this project tomorrow. |
|
Another view of the CNW Engine Facility |
Look what came in the mail today!
|
The outer wrapper... |
|
And what's inside? The Engine Facility light fixtures! Yeah! |
Wed, Apr 12, 2023
More work on the placement of the light fixtures at both Engine Facilities...
|
I need to figure out the best gaps to keep because I'm not putting lights in each of the slots. That would be way too many lights. |
|
Some challenge different perspective. |
|
I've already removed the extra places and these will be the final spots for the new lights. |
I'm trying to keep the total at 10 light poles for each Engine Facility.
Thu, Apr 13, 2023
Lots accomplished at the two Engine Facilities...
Check this out:
|
I think I have the spacing figured out. I will need 17 lights for the UP Engine Facility. |
|
Here's another view from a different perspective. |
|
I also figured out where the spacing would be for the CNW Engine Facility. I will need 24 lights for this Facility. |
|
Here's another view from a different perspective. |
|
And what it looks like underneath before any wires are brought from the top to the bottom... |
|
You can see how the lights are drilled in rows. |
|
I few more pictures. |
|
One last view underneath the table. |
|
What's it look like with all the Locomotives back in place? |
|
Looking at the UP Engine Facility from the East. |
|
A quick move south and here's the CNW Engine Facility from the same East view. |
|
The CNW Engine Facility from the opposite direction. |
|
Another angle checking out the placement of the light poles. |
Fri, Apr 14, 2023
I got up early and did some work on the RR...
|
First, I secured the beams together with super glue. |
|
Time to paint the sidewalk and middle section. |
|
/That looks way better. |
I'm subbing today so it's time to go to school. I'll come back at lunch to paint...
|
Hopefully I'll have enough time to get these parts painted... |
|
So far, so good. |
|
The deck bridge sections came from a different kit. |
|
Next step is to glue the bridge section to the concrete sections. |
|
After I get back from school this afternoon, we'll figure out the next steps... |
I'm back from subbing.
Now let's figure out how to install the bridge sections...
|
I'll use these styrofoam pieces for support while the glue on the deck bridge sections cures. |
|
Pre-deck bridge assembly. |
|
Deck bridge in place and supported by the styrofoam. |
|
Front deck bridge in place with supports. |
|
While that dries, I will work on the grade crossing. |
|
Finally, we return to the bridge installment. Looks like I'll need to add a "filler" to fill the gap. |
Sat, Apr 15, 2023
Lots of work to do at Oak Park Marion Street.
I stood for a while just trying to figure out where to start.
I started at the new substation and decided to connect the power lines from the Tall Towers.
Here's the steps I took to finish this little project...
|
Preparing the wires to connect to the new substation. |
|
Wires connected, before trimming. |
|
A little different perspective. Still need to trim the wires. |
|
I tried to add flash, but that just makes it look too confusing with all those wire shadows. |
|
Finally, I trimmed the wires and here's the finished product! |
After dinner, it's time for more trains.
I'm going to work on the urban steel overpass signage...
|
I found a deck girder piece I will use for the steel bridge and the sign that says, "Marion". |
|
The sign will go between the bridge deck and the girder at the track level. |
|
I did my own rendition of "Marion" |
|
And here's the prototype. |
|
My cutting board where I cut the station platforms in half. |
|
It's a bit tricky and I'm not using the whole kit. Since the prototype uses only half a covering, so will I. |
No comments:
Post a Comment