Sun, Nov 20, 2022 thru Sat, Nov 26, 2022
Sun, Nov 20, 2022
Still updating my roster on JMRI
![]() |
My spreadsheet roster and then I printed out the Commuter Locomotive section for the CT Engine Shop. |
![]() |
I will use this top sheet on my spreadsheet to track all the changes I'm making to JMRI |
![]() |
Here's another view of my "cheat sheet" |
![]() |
And this is why I need the cheat sheet. It tells me where each locomotive is stored at the Chicago Terminal Engine Shop |
![]() |
Before proceeding I need to write down the JMRI entries for each DCC decoder |
![]() |
Here's the lineup for tonight's JMRI updates. |
![]() |
All finished! Everything is working properly! |
![]() |
One more look at the finished product. |
![]() |
And finally, the JMRI roster screen. |
I'm getting closer and closer to completing this project.
Mon, Nov 21, 2022
Train Day!
w/Rob Fair 6-8pm 2 hrs.
Jordan stopped by for a quick visit.
![]() |
Rob Fair & Jordan Osborn pre-session. |
Rob Fair will be running Mixed Freight Train 5D.
I will take Commuter Train 1A from Geneva to Chicago Terminal.
Mixed Freight 5D initial switching
Duration: 00:00.27 sec.
Elevated Track near Oak Park Marion Street Station
Duration: 00:00.31 sec.
Approaching Bellwood Station before Proviso Yard
Duration: 00:00.30 sec.
![]() |
Last lap before heading to CNW Proviso Yard. |
Taking Crossover #3 in preparation to enter CNW Proviso Yard
Duration: 00:00.29 sec.
Final approach into CNW Proviso Yard Track 3
Duration: 00:00.19 sec.
We also had to send one of the cars to the Workbench for coupler replacement
![]() |
You can see the brake hose is really bent up. I've decided I'm just changing out both couplers. |
Tue, Nov 22, 2022
First thing this morning I was up early and
did some track maintenance
assigned from last night's session.
Here are the pictures showing the progression of the job...
![]() |
This first picture shows how I slid a staple under the track to lift it up a bit. |
![]() |
I thought it was too high, so I turned the staple on its side to make it not as high. I like it. |
![]() |
I also had to drill a hole in the tie to make it secure. Hopefully this will work and we won't have any more derailments. |
Tonight's activities:
Wed, Nov 23, 2022
I'm going to get the Intermodal Train 2B going today...
Check this out...
Start at the Train Order Board
Duration: 00:00.40 sec.
Global 1 Switcher SW3 will put the train together
Duration: 00:00.30 sec.
Daylight Dave call out...pulling out the Intermodal Train 2B
Duration: 00:00.24 sec.
SW3 Switcher finished putting Intermodal Train 2B together
Duration: 00:00.31 sec.
Runaround
Duration: 00:00.30 sec.
SW3 Switcher making its way back to Global 1 Storage Track
Duration: 00:00.29 sec.
Back to where we started - Power Off
Duration: 00:00.15 sec.
![]() |
On The Job was 23 min. Here's the Train Cars in Consist Worksheet paperwork completed by the conductor. |
Thu, Nov 24, 2022
Happy Thanksgiving!
Had some time to work play on the RR:
Yesterday I switched the Intermodal Train 2B from Global 1 ready for the Mainline
today it's time to run the Intermodal Train 2B on the Mainline.
Here we go...
Intermodal Train 2B WB Track 1
Duration: 00:00.25 sec.
Intermodal Train 2B running through Proviso Yard WB
Duration: 00:00.31 sec.
Red Signal at Signal Bridge #4 WB Track 1
Duration: 00:00.19 sec.
The next thing to do today is to move all the active commuter locomotives
from the CT Engine Shop to each respective train.
![]() |
Here are three of the four Commuter Locos in place for their WB runs to the suburbs. |
![]() |
I also used the PYUP switcher SW1b to move the PICK UP cars to the EB Pick Up tracks at CAMF1. |
Fri, Nov 25, 2022
Celebrating Thanksgiving with Family today...
I did ask James to come down to see the progress on the RR...
![]() |
James liked the progress. His sign means, "Peace". |
Working Proviso Yard for the first time
Duration: 00:00.25 sec.
Sat, Nov 26, 2022
Intermodal Train 2B & Train Order Board
Duration: 00:00.31 sec.
Where are the 4 cars on the Industrial Park Transfer Track?
Duration: 00:00.29 sec.
4 cars from Industrial Park Transfer Track found
Duration: 00:00.31 sec.
Paperwork - Train Cars in Consists
Mixed Freight Train 5C
Duration: 00:00.32 sec.
No comments:
Post a Comment