Monday, August 9, 2021

Week 367

 Sun, Aug 8, 2021 thru Sat, Aug 14, 2021

Project Planning

CountPriorityKey
2ATop - This Week
2BTop - Next Week
4CMid - This Month
12DMid - Next Month
4ELow - This Year
3FLow - Next Year
26GCompleted/Done!
53

Project Priority List
PriorityOrigination DateLatest UpdateProject NameProject DescriptionDone! Date
A5/13/20215/13/2021ballast RIP Shopfinishing touches
A7/1/20217/1/2021Finish wiring Crossover 2.5Will need to figure this out.
B5/11/20215/11/2021West Chicago StationPlatform/lighting
B5/11/20215/11/2021Finish Bridge/UnderpassMelrose Park downtown curbs, sidewalks, gutters, buildings
C5/11/20215/11/2021Winfield/Berkeley StationPlatform/lighting
C5/11/20215/11/2021Oak Park Marion Street StationLighting/kitbashing
C5/18/20215/18/2021Mainline ballastingBetween Crossover #2 and WeGo Diamonds - back tracks in front of WeGo downtown
C6/4/2021Finish decoder installationUP SD50 #53


Sun, Aug 8, 2021

Big Day today!
First, I went with Jordan and Chris (his dad) to the Great Midwest Train Show in Wheaton at the DuPage Co. Fairgrounds today...
This is what I found...
I needed a couple of switches, but only purchased this one for the Melrose Park Power Plant yard.
Cost: $13.75
Then I found the CNW Falcon Service piggy back car for $14
Entry Fee: $7
Paid $2 for underpayment of an item
Total expense: $37.75

Next we stopped by the Elmhurst Model Railroad Club
Here's the floor layout with the Video locations shown on the map.

Video 1 - N Scale Section
Length: 00:00:27 sec.

Video 2 - N Scale Section
Length: 00:00:16 sec.

Still shot from video 2 N Scale section

Video 3 - HO Scale section
Length: 00:00:29 sec.


An Amtrak HO scale train coming around the bend.


Mon, Aug 9, 2021

Train Day!
w/Jordan Osborn and his dad, Chris Osborn
Rob Fair was still returning from his vacation last week in FL

We didn't get any work done, but we did talk a lot of trains and went through Rob Linke's treasures he delivered to me today.

I took a video of our opening night tour...
Length: 00:00:31 sec.

We did quite a bit of research tonight.
Jordan tweaked the monitor so it would change from B&W to Color.

Talking trains...

Investigating one of Rob Linke's steam locomotives.
A 2-8-8-2 #2197

The locomotives will need some work.
The big surprise were all these switches.
I will use these in the industrial park once we start laying track.

Tue, Aug 10, 2021

I did some reorganizing of Rob Linke's train donation...
There was a nice collection of nickel silver track sections.
Especially nice was the #4 and #6 left and right hand switches.

Here are some of the homes Rob Linke had in his collection from the 1970s.

This model reminded me of Edman Chapel which I will install between Wheaton & College Avenue stations on the campus of Wheaton College.

Wed, Aug 11, 2021

Intermodal train heading back to Global 1
Length: 00:00:24 sec.

Continuing on its mission...
Length: 00:00:26

Highball
Length: 00:00:21

Tonight I inspected the piggy-back car I bought on Sunday.
It passed with flying colors.

And here's the inspection report ready to be completed when the car is put on a test train.
This will be completed by the engineer who runs the test train.

Thu, Aug 12, 2021

I worked on the two switches I need to replace...

This is the switch at Global 2 that needs to be replaced.

And this is the new switch in place of the old one.

Now moving over to the yard at the Melrose Park Power Plant.
I need to replace this terribly bad switch.

I've removed the terribly bad switch and am getting ready to install the new switch shown above.

New switch in place of the terribly bad switch which will go directly into the garbage!

Fri, Aug 13, 2021

As it goes...I started working on a project that wasn't anywhere in the planning stages...

The Industrial Park steals the show today on the project list:

In the foreground is the first switch I installed to replace the old one.

I continued to lay track up to the bridge.
I also had to replace two other switches which needed the throw bar flipped from one side to the other.

I continued to lay track past the bridge up to the end of the line.

This view looks back at the entrance of the Industrial Park and another pick up location.

The same perspective but now you can see the mainlines and the approach to the Industrial Park much better.

This view captures the run around.
The tracks aren't all connected, but you can get a feel for how it will fit.

End of the line.

Sat, Aug 14, 2021

Video Overview of the Industrial Park
Length: 00:00:31 sec.

Edman Chapel from Rob Linke
Length: 00:00:31 sec.

I'm going to take out these 9" straight tracks and put in three (3) re-railer tracks.
I'll use these as station platforms for excursion passengers.

Here are the new re-railers installed in place.

A drone view of the newly installed and tacked down Industrial Park tracks.

And the entry tracks to the Industrial Park.

Tim Sivesind had these three (3) tall bar tables I'll use for operations.
This one is near the north power district.

This 2nd tall table can be used for staging projects and tools.
This one is located near the Control Tower and the south power district.

And finally, the 3rd table will be used to stage paperwork at the Powder River Basin.
I may get one more table for a location tbd if needed.

Installed safety crossbucks for excursion passenger passage.

Excursion cars in place.


Project Progress Report

CountPriorityKey
2ATop - This Week
2BTop - Next Week
4CMid - This Month
9DMid - Next Month
4ELow - This Year
3FLow - Next Year
32GCompleted/Done!
56


Project Priority List
PriorityOrigination DateLatest UpdateProject NameProject DescriptionDone! Date
A5/13/20215/13/2021ballast RIP Shopfinishing touches
G8/13/20218/14/2021Lay and fasten tracks in Industrial ParkFollowed track plan and secured track and cleaned each rail ready to test on Monday8/13/2021
G8/14/20218/14/2021Replace 9" straight track with rerailersI will use the re-railers as station platforms for the excursion train8/14/2021
A7/1/20217/1/2021Finish wiring Crossover 2.5Will need to figure this out.
B5/11/20215/11/2021West Chicago StationPlatform/lighting
B5/11/20215/11/2021Finish Bridge/UnderpassMelrose Park downtown curbs, sidewalks, gutters, buildings
C5/11/20215/11/2021Winfield/Berkeley StationPlatform/lighting
C5/11/20215/11/2021Oak Park Marion Street StationLighting/kitbashing
C5/18/20215/18/2021Mainline ballastingBetween Crossover #2 and WeGo Diamonds - back tracks in front of WeGo downtown
C6/4/2021Finish decoder installationUP SD50 #53


No comments: