This Week's Goals
1. Continue work on Clinton Ave. wall sections
Progress: Need to purchase more parts...
2. Continue work on California Ave. Coach Yard entrance off Sacramento Blvd.
Progress: Continue working on this and maybe finish during Week 335
3. More Weathering Locomotive Roster
Progress: Continue on CNW fleet - one finished more to go...
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Concentrating on Goal #2 this week, will tackle this next year.
Sun, Dec 27, 2020
James, Natalie, Josiah and Lissette came out today for a few days.
Josiah said, "Let's go downstairs to trains."
I said, "OK." :)
We played a bit with Thomas the Tank Engine. |
And then we set up the infamous oval track. |
We got a train running...check this out.
Length: 00:00:20 sec.
Mon, Dec 28, 2020
Before Train Day, Josiah and I had some train time
Length: 00:00:20 sec.
Train Day!
with Rob Fair and Jordan Osborn
6-8pm 2 hrs.
Jordan Osborn greeting our arrival. |
Rob Fair checking messages. |
We'll be running some trains tonight. First step, take the well car in the train shown and add to intermodal train. |
Metra Commuter Train heading to Chicago
Length: 00:00:30 sec.
Rob Fair continues work on Goal #2. He's adding the wood work around the edges. |
The AC6000 is putting together the intermodal train. Once it's ready it will depart Proviso Yard. Destination: Global 1. |
Length: 00:00:06 sec.
Intermodal Train arriving at Global 1
Length: 00:00:14 sec.
Work continues on the Sacramento entrance of Metra California Avenue Maintenance Facility. |
Moving piggy-back cars from Global 1 to Global 2. |
Piggy-back train on the move to Global 2. |
I think the sign is too large. I will re-print and re- set the sign with better proportions. |
The hardest part in this step is finding the dang end. |
After taping the gaps between the foam board, we covered with first layer of filler sand. |
Final picture of the night. |
Tue, Dec 29, 2020
I'm preparing paperwork for running trains next week during our first ever Operating Session! |
Progress on the Sacramento Rd. Entrance to California Ave (UP/Metra) Coach Yard (Note name change, from "Maintenance Facility" to "Coach Yard"). I made the change after re-reading the sign. |
Wed, Dec 30, 2020
Materials ready for gluing on the top coat. |
Sand filler in place. |
Top layer in place. |
Top layer now in place and waiting for glue application. |
Thu, Dec 31, 2020
This morning...
Glue now in place waiting for it to cure. I used an eye dropper with 50/50 glue/water mix with a squirt of liquid dish detergent |
Same for section near the road that will meet the lift-out section. |
This afternoon...
I'm going to paint the concrete this afternoon. |
Going around the bend in a minute. I'll take a finished shot tomorrow after weathering and letting the paint dry. |
This evening I did some paperwork for train operations on Monday.
Here's a sneak peak...
Each person will receive a clipboard. One for me, Rob, and Jordan. |
The Cover Sheet has our instructions for the operating session. |
The Dispatcher's Log shows what's what on the mainline. |
This is the Code Sheet which tells what all the Codes mean on the different sheets. |
This sheet we'll use to capture any incidents along the way so I can document and look for any patterns. I will also use this to keep the engineer busy on his mainline runs. |
Fri, Jan 1, 2021
Happy New Year!
Stayed home all day and worked on projects with Jan and on the RR...
I bought another engine yesterday, so now I need to make room for it in the UP Yard. It is a Kato UP C44-9W to make a pair with the other unit. |
So I'm going to move #53 over to share Track 1 with the SW1500 UP engine, both switchers. |
Half way through the project... |
DONE! |
I thought I took this picture with a steady hand, but, obviously I didn't. I'm going to isolate power to the spur on the empty outside track. |
Can you see the gapped rails and the terminal track that I installed? |
I'm going to get the wire ready tonight, and then tomorrow I will hook it up so I can switch power to this track on and off. |
Sat, Jan 2, 2021
Finishing off the week...Here we go...
New project not part of my current "Goals". Installing switches for locomotive tracks. |
My initial plans were to use this metal plate. |
Secure the plate using wood for mounting. |
Turns out I would need to purchase another drill bit and I decided against that idea. |
In the meantime, I cut the rails to isolate the track. |
Drilled the holes for the wires to connect to the rails. |
Tomorrow I will hook everything up and get these tracks powered up using a switch to turn off and on.
This Week's Goals Progress Report
1. Continue work on Clinton Ave. wall sections
Progress: Need to purchase more parts...
2. Continue work on California Ave. Coach Yard entrance off Sacramento Blvd.
Progress: Just about finished. Just need to add a few more details such as utility poles and power hub.
3. More Weathering Locomotive Roster
Progress: Continue on CNW fleet - one finished more to go...still need to work on this...
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Concentrating on Goal #2 this week, will tackle this next year. Yes, probably next week.
No comments: