Sun, Dec 20, 2020 thru Sat, Dec. 26, 2020
This Week's Goals
1. Continue work on Clinton Ave. wall sections
Progress: Need to purchase more parts...
2. Continue work on California Ave. Metra Maintenance Facility entrance off Sacramento Blvd.
Progress: Will accomplish more on Train Day, Mon, Dec 21, 2020
3. More Weathering Locomotive Roster
Progress: Continue on CNW fleet
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Will try to do more this week...
Sun, Dec 20, 2020
SPECIAL GUEST
Length: 00:00:20 sec.
Mon, Dec 21, 2020
Ben's Birthday and also...
Train Day!
Rob Fair 6-8pm 2 hrs.
Jordan Osborn 6:45-8pm 1.25 hrs.
Working on Goal #2
We decided to use a different structure for the building at the entrance of the Metra Maintenance Facility. Here Rob recuts the foundation for this structure. |
Crew assigned to put up the signage at the Metra Maintenance Facility. |
Rob Fair shows off his handiwork. |
Jordan at the controls out on the tracks...
Length: 00:00:23 sec.
We lowered the door from the structure to the foundation. Some intricate detail work. |
Jordan stops by to take a look at the progress. |
Here's the prototype next to the model |
I was also able to make some progress on getting the materials cleaned out and straightened up so we can use this as an unobstructed isle once again. |
Tue, Dec 22, 2020
Jan and my anniversary - 41 years (1979)
Plus I was able to work on the RR...thanks Jan!
What a mess! Working from the prototype photo on the left, I keep chiseling down on the foam board. |
Removing the model and looking at all the remains. |
Model in place. Now for some details. |
More chiseling of the foam board. |
Sidewalk in place plus the side walls. |
Next up is the wood trim. Maybe tomorrow night. |
Wed, Dec 23, 2020
Progress on Goal #2 today:
Today I'm going to secure the foam piece to the base using the foamboard adhesive shown in this photo. |
Base in place with weights as I wait for the glue to set. |
I noticed the sidewalks were slipping so I figured out how to weigh them down using the tube dispenser. |
Thu, Dec 24, 2020
Christmas Eve!
Heading to the office later today so I had some time this morning to work on the RR
Securing the concrete walls at the entrance. Front and side. |
I'm going to clear off the shoulder and put in foamboard that will be used to meet the newly constructed entrance to the California Ave. Metra Maintenance Facility. |
Shoulder cleared. |
Using the tube dispenser again to hold the concrete wall in place while the glue sets. |
Adding foamboard to the shoulder. |
Another section... |
More sections added... |
Final piece in place. Now it's time to fit them together and make some adjustments as needed. |
Hopefully when this section is put back in place it will line up with the foam pieces I put on the road shoulder in the previous pictures. |
Fri, Dec 25, 2020
Christmas Day!
Before heading to Chicago to visit James & Natalie and family I took some time to work on the RR.
Before heading to the basement I wanted to research why my Walthers Metra F40PH runs so jerky.
Using the Digitrax io-Group I found a possible solution. I will try this suggestion in the near future. |
Now let's get downstairs...working on the foamboard. |
Matching the meets - where the foamboard meets the two sections. Section one on the base and section two on the lift out. |
Should be interesting to see how close I can get this so you can't see the seam. |
Another angle. |
Adding downslopes around the pond. |
This is what Natalie got me for my Christmas present. After all these years, I still love getting toys over clothes. |
Sat, Dec 26, 2020
Adding the foam pieces on the down slopes. |
Section by section by the roadside. |
Bit by bit... |
Time to trim and then... |
...start painting. |
Painting finished by the roadside. |
Painting finished on the entrance side. |
Back to the clean up of the isle space. |
DONE! And this wasn't even set as one of my goals! |
Back at the Sacramento entrance. Time for signage. |
This Week's Goals Progress Report
1. Continue work on Clinton Ave. wall sections
Progress: Need to purchase more parts...
2. Continue work on California Ave. Metra Maintenance Facility entrance off Sacramento Blvd.
Progress: Continue working on this and maybe finish during Week 335
3. More Weathering Locomotive Roster
Progress: Continue on CNW fleet - one finished more to go...
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Concentrating on Goal #2 this week, will tackle this next year.
No comments:
Post a Comment