Sun, Dec 13, 2020 thru Sat, Dec 19, 2020
This Week's Goals
1. Begin work on Clinton Ave. wall sections
Progress: Decide how to proceed during Monday Train Day.
2. Begin work on California Ave. Metra Maintenance Facility entrance off Sacramento Blvd.
Progress: Not Started, hopefully we'll start on Monday.
3. More Weathering Locomotive Roster
Progress: Started Fri, Dec. 11, 2020. Six done, nineteen to go.
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Laid out markings, but not officially started yet.
Sun, Dec 13, 2020
|
Dang! I thought this picture turned out. I must have moved a bit as I took the picture. This was supposed to be the BEFORE shot. |
|
And this one is the AFTER shot. |
|
AFTER - different perspective. |
Checking out the weathered locomotivesLength: 00:00:27 sec.
Mon, Dec 14, 2020
Train Day!
w/Rob Fair and Jordan Osborn
6-8pm 2 hrs.
|
Rob Fair getting ready for tonight's project. He'll be tackling Goal #2 tonight. |
|
Jordan Osborn greeting our arrival. |
|
Removing the work station. Goal #2 |
|
Here's what we're working on. The entrance to California Ave. Metra Maintenance Facility. |
|
Rob Fair cutting the foundation for the building. |
|
One more look at the line of weathered locomotives. |
|
All the weathered locomotives back in place. |
Video of a train meet (not "match")!
Where did that come from?
Length: 00:00:30 sec.
Tue, Dec 15, 2020I needed to do some sign printing so I decided to print out the signage for the
Metra Maintenance Facility at California Ave.
|
Laying out the signage. |
|
Another view. |
|
Also working on the entrance off Sacramento Blvd. I took these Google photos for Rob to use on Monday. |
Moving into GOAL #1. Here's some progress...
|
Entrance/Exit to parking garage under terminal. |
|
Prototype |
|
Added the posters. |
Wed, Dec 16, 2020
Thu, Dec 17, 2020
|
Today I weathered my first CNW locomotive. |
|
I also finished weathering the last of the UP fleet. |
|
Now it's time to start the wall along Clinton Ave. in downtown Chicago near the Chicago Terminal. |
|
Here's the prototype photo that I will incorporate into the model. |
|
Assembling the wall... |
|
Finishing up the final section. |
|
All the pieces are glued together.
|
|
How does it fit in place? Pretty good, I'd say. |
Fri, Dec 18, 2020
|
Before painting, I need to put the top layer which is called the cornice. |
|
Time to paint. |
|
Done! |
|
Now to paint the dock doors which I will use as windows blackened in to look shaded. |
|
On to the next project while the paint dries. I mounted the Metra signs on styrene to make them stand out a bit. |
|
Here are the signs ready to be mounted on the building. |
|
I attached this one using the Gorilla super glue you see in the picture. |
|
Front sign installed. Still need to mount the side signs. |
Sat, Dec 19, 2020
Finally, one last thing before we close out week 333
|
Mounted the sign on the Metra Maintenance Facility.
|
|
Also the west dock. |
|
You'll have to wait for morning to check out the east dock. |
Instead of waiting until next week, I took the next picture Sunday morning so you could see the results right here and now...
|
The sign is a little lower than I thought, but it will do. |
This Week's Goals Progress Report
1. Begin work on Clinton Ave. wall sections
Progress: Began project this week. See Start up Tue, Dec 15 entry...more to follow...
2. Begin work on California Ave. Metra Maintenance Facility entrance off Sacramento Blvd.
Progress: Started Mon, Dec. 14 Train Day!
3. More Weathering Locomotive Roster
Progress: Started Fri, Dec. 11, 2020. UP fleet complete. Started CNW; finished one.
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Laid out markings, which means we've unofficially started planning, but not construction.
Great to see mom and dad enjoying the basement project.
ReplyDelete