Saturday, June 20, 2026

Week 621

Sun, Jun 21, 2026 thru Sat, Jun 27, 2026

Sun, Jun 21, 2026

No Train Activity today.

Mon, Jun 22, 2026

Lots of switching today for Train Day!
Only me on the job today.

Working on Sequence Train 8
Industrial Park Yard Master

Grabbing clipboard 4D Sequence Train S8 manifest

Starting today's assignment at 0:02

Pulling Switcher SW2 from MPPP Track 6

See YouTube Layout Update Video for more action.
That took 22 minutes. I will mark down .5 hr. on
Timeline Spreadsheet.

Mission Accomplished!
Blue Box Car at warehouse 4

Yellow hopper at manufacturing plant 2

3 of 4 covered hoppers at grain elevator

4th covered hopper set at MPPP Track 1

That'll do!

Tue, Jun 23, 2026

No train activity today.

Wed, Jun 24, 2026

Oops!
There's a leak in the basement...

In this picture, you can see where 4 holes were made
by the leaks from above. However, I could find
no evidence of these leaks in the ceiling rafters.

I plan to use this tray to catch any further leaking.

I will mount the tray in this location where I think
the linking is occurring.

Hopefully I can mount the tray tomorrow...

Thu, Jun 25, 2026

More work on the "leak" in the basement...

Gathering my tools for the next phase of this project.

I will hang the pan by these hooks I just installed

After figuring out how to use the wire to support the pan...

...I mounted the pan over the where
the leak caused damage below

Now to fix the damaged area.
First, I filled in the "holes" left by the drops of water

Since I'll need to spray the area with water I found a cap to
cover my photographer

Then I filled in the areas around the sidewalk with fine sand

Before gluing the sand down, I need to spray water on the sand

Followed by gluing with a 1/4 ratio glue to water.

Adding medium coarse ground cover is next.

Finally removing the tape and letting the scene dry is the last step.

Fri, Jun 26, 2026

No train activity today.

Sat, Jun 27, 2026

Updating Video Production
for Weekly Layout Update
to view
Duration: 07:14 min:sec

Description

What's ON Track this Week?

*Train Order Board Sequence Job 8
*Switching Industrial Park
*Fixing leak in the basement
*Repairing scene after damage from leak
*Thanks for watching a leaving your comments

No comments:

Post a Comment