Monday, December 30, 2024

Week 544

Sun, Dec 29, 2024 thru Sat, Jan 4, 2025

Sun, Dec 29, 2024

Working on the lower wall on Canal Street, Chicago

Adding two sections of underpasses.

One of those underpasses is shown here.

Looking at the underpass straight on.
Putting the pieces in place for layout.

Canal Street is ready for details.

Everything now glued in place - permanently.

All the way to the end of the layout.

The other underpass.

My work station with most of the pieces now used up.

That took 47 minutes. I'll record .75 for my records.

Mon, Dec 30, 2024

Jordan shows off his new iPad he got for Christmas.

Another work space used to check the new lamp posts.

Drilling the hole for the new lamp post.

Inserting the wire using the flashlight for light.

Lamp post inserted. Now to hook up the wires.

My restaurant scene had chairs and the umbrella 
blown over. I made some minute adjustments.

Looking much better.

Tue, Dec 31, 2024

No train activity today.

Wed, Jan 1, 2025

More work on the Clinton Street Chicago Terminal Project

Holes are drilled and plastic tubes inserted.
The plastic tubes act like conduit for the wiring.

A look along Clinton Street viewing south.

This first session today took 12 minutes.

Later today...
I grabbed a Google Maps view of what I'm trying to model.

On the model I left the top part of the wall open
so I can view the trains as they arrive into the station.

This is the view of Clinton street looking north.

This is the same view of the model on Clinton Street
looking north.

I even wired up the lights
to illuminate them.

The same view looking the
other direction.

That session took 55 minutes.
I told Jan I would only be gone 30 minutes.
Oh oh...

Thu, Jan 2, 2025

Removing the facia so I can work on the underpass
sections.

I need to remove the sidewalk sections for the road
to pass through.

I used a Dremel tool to carve out the ends of the
sidewalks.

Then slowly remove the sidewalk and trim the corners...

...on both sections.

That part of the project to 26 minutes.

Fri, Jan 3, 2025

Train operations at Tom Stover's today...

Train 24 heading EB out of Denver

The first of 5 crew members.
Carl, Tom and Glynn.

Still running EB through Brekenridge.

Our fourth crew member, Duane.

Back in my basement...


Adding the crosswalk lines.

Both sections.

Next up:
Adding trees and purchasing traffic signals.


Sat, Jan 4, 2025

Jan and I went to Hobby Lobby and bought...

12 Deciduous Trees 12 pc 92046
Item $10.99 Tax $0.88 Total $11.97

First Tree Planted!

The rest are ready to be planted.
Hopefully later today.

Later that same day


Drilled out the holes for the tree stumps. Then I 
cut out the square for the planting box.

Planting the trees...

All the trees are now planted.

Another look from the other view.

Facia and glass protective sheet in place.

This is as far as I'm going to get on Clinton Street for now.
I plan on adding traffic signals at both underpass intersections.

More later...

For now?

to view Weekly Layout Update
Clinton Street Chicago Terminal Project Progress
Start to Finish...almost.
Duration: 10:28 minutes



No comments:

Post a Comment