Sun, Nov 19, 2023 thru Sat, Nov 25, 2023
Sun, Nov 19, 2023
After moving out the commuter train for Monday's Train Day...
Commuter Train 1C ready for WB departure from Chicago Terminal. |
I decided it was about time to start working on the CNW Engine Facilities platforms...
Getting started... |
Making progress... |
That's enough for tonight. |
Mon, Nov 20, 2023
Train Day!
w/Rob Fair 6-8pm 2 hrs.
Jordan Osborn 6-7:30pm 1.5 hrs.
Here's what we did...
Rob Fair taking out the EB Unit Coal Train from Powder River Basin bound for the Melrose Park Power Plant |
Immediate crossover before Signal #2 to continue on its EB journey |
Unit Coal Train on Elevated Track EB
to view YouTube Video
Duration: 00:30 sec.
Meanwhile... Jordan and I run the WB Commuter Train 1C on the West Line bound for Geneva |
Rob has arrived at the Melrose Park Power Plant and begins to switch the train into the Power Plant yard. |
Jordan peers out from under the BNSF cap. |
Rob and I take the Commuter Train 1C EB back to Chicago Terminal. |
Commuter Train 1C arriving at Chicago Terminal safe and sound. Some minor glitches along the way but all in all, not too bad. |
Tue, Nov 21, 2023
I stopped by ACE today and bought some super glue. I'm out and always could use a bit more. |
Wed, Nov 22, 2023
Running 1960s Train 3A with Power B3 UP SD40-2 2056 3571 |
Running WB passed Geneva |
Coming down the heart of Proviso Yard |
Waiting for next lap at the Lap Counter Location which is Washington Street in West Chicago. |
Later tonight, I started to reconcile these two report. The top report shows each train run with dates. The bottom sheets shows who was assigned those runs. |
This is how much time I spent on this project today. |
Thu, Nov 23, 2023
Same project another day. |
I was able to reconcile each report. Now I need to update the spreadsheet. |
More to come...
Fri, Nov 24, 2023
Finished running 1960s Train 3A...
Parking the WB 1960s Train 3A into PYCNW EB Track 2. |
This train will be ready to head EB on its next Train Order Board assignment.
...with Power B3 back in place at the UP Engine Facility. |
Also worked on Train Cars in Consist - Conductor Paperwork
BEFORE Completed worksheet. |
AFTER Made some changes...ready for next run. |
Sat, Nov 25, 2023
Lots of work on the CNW Engine Facility Platform patterns
and lots of reconciliation in reporting...
Check this out...
More pattern cutouts for CNW Engine Facility |
Finishing up tracks 4 & 5. |
There you go. All set! |
I also decided to extend the platforms into the buildings. |
Another view of the CNW Engine Facility |
And just because I was looking...here's another shot of the UP Engine Facility. Nice! |
In this report you can see how many Minutes/Hours each locomotive has run since 2021. |
This report shows how many Minutes/Hours each Engineer has run on the RR since 2021. |
This report shows how recent Metra locomotives and any Switcher was run and what train it was connected. |
Same type of report, but this time it's all the UP locomotives. |
Most recent runs for the CNW locomotives with the trains connected to each locomotive. |
Here's my reconciliation to the report below (by date) and this report by locomotive. |
I reconciled this report with the one above to figure out the proper laps run for each locomotive and train connected to that locomotive. |
This was a very intense assignment!
When I finished I was off by 3.5 laps.
I looked it up, found the mistake, and had a successful result.
YES!
No comments:
Post a Comment