Sun, Sep 17, 2023 thru Sat, Sep 23, 2023
Sun, Sep 17, 2023
I've been working on the RR...
Tonight I'm going to install the new UP5 I bought from B&G last week. |
I will use this location when consisting the CNW locomotives and moving them out of the Engine Facility |
The opening states it should be as shown above. |
Drilling out the initial holes, and then using the jig saw to cut out the small square. |
Ready for inserting the UP5. |
All set and ready to be hooked up. That part will come much later, because I need to figure out which cable to use. |
I thought I should get started on the platforms at the CNW Engine Facility.
I'll need to go back and label each and then label the cork below so I make sure I install them in the proper location. |
Working on the next priority train - #5. Mixed Freight Train 5A... |
...led by power C4 C44-9w #8659 & 8718
|
Tracking the Mixed Freight Train 5A as it makes the first lap around the layout going EB on Track 2. |
One more try on uploading a video.
I don't have high hopes for the blog.
If it doesn't work I'll just upload a YouTube video.
Here goes...
Nope, it didn't work.
to view the 33 second YouTube video instead...
Mon, Sep 18, 2023
Train Day!
with Rob Fair (6-8pm 2 hrs)
Jordan Osborn (6-7:30pm 1.5 hrs.)
Marcus Thorsen (6-7:45pm 1.75 hrs.)
Marcus brought over a ton of landscaping materials. |
Jordan reviews the product. |
Discussing the latest in spiritual matters. |
Running trains. Mixed Freight Train 5A heading EB in lower left corner of this picture. Also, in view, is the Excursion Train 4A on the elevated tracks in the distance. |
Here comes the Mixed Freight Train 5A coming around the bend. |
to view two trains meeting near Melrose Park Power Plant
Video duration: 0:29 sec.
Mixed Freight 5A on elevated track. |
to view YouTube 0:12 sec video of Crossover
of the EB Track 2 Mixed Freight Train 5A to WB Track 1
WB to enter Proviso Yard UP Track 1.
Final approach into Proviso Yard UP West Yard Track 1. This is an EB train ending up it's 5 lap run in the WB yard eventually returning on a WB trip. |
Tue, Sep 19, 2023
No train activity, but I did catch another mouse.
Wed, Sep 20, 2023
So far I've caught 5 mice.
I was also able to organize the cars I removed from service on Monday...
These are the 5 cars I removed. All because of coupling issues. |
This is the conductor's report which shows all the activity from Monday's operating session. |
I will put all 5 of these cars through a full maintenance inspection.
Thu, Sep 21, 2023
Working at the workbench tonight...
One down 4 to go... |
The first car is ready for PICK UP and the next WB test run for Mixed Freight Train 5A. |
Fri, Sep 22, 2023
Working at the Workbench and getting more cars back in service...
Just two more cars to go. Here's what it looks like at the workbench as I work through each inspection sheet. |
This was a very old order that I finally finished. |
Here are the 5 cars that were removed from service on Monday but ready for work by today, Friday. |
Another look at my busy workbench. |
This is the inspection checklist. |
I also resurrected this car from a cardboard box that Marcus brought to one of our train sessions. |
This car will be added to Mixed Freight Train 5A next time it runs WB. |
No comments:
Post a Comment