Sun, Sep 3, 2023 thru Sat, Sep 9, 2023
Sun, Sep 3, 2023
Just a little work on the RR (30 mins.)
|
Finishing up the last "walk ways" at UP Engine Facility. Just a couple more to go. |
Mon, Sep 4, 2023
Happy Labor Day!
Some work done during the day...
|
Cutting out the final platforms at the UP Engine Facility. |
|
Between the rails. |
|
Laying out the pieces to see how they fit. |
|
Used the hot glue gun to put all the pieces in place. |
|
Mission accomplished. Time to weather... |
|
Sprinkle with gray "mortar" powder. |
|
Add tire marks. |
|
Fill in "mortar" to be used as the base of landscape. |
|
Apply the glue... |
|
"Paint" the glue to spread it over the landscape. |
|
Add medium mixed ground foam. |
|
Drone view. |
|
Finally, add some black cinders used as ballast. |
Train Day!
w/Rob Fair 6-8pm 2 hrs.
|
Taking out the Atlas Snap Switch and replacing with one of Marcus's #4 switches. |
|
Rob begins the replacement project by inserting the plastic rail joiners at the base of the switch. |
|
Next he fits and cuts the piece tracks at the other end. |
|
Looking good. Time to test out the power continuity. |
|
We had some problems with the switch, which we will take a look at more closely next week. We will solve this dilemma. |
I took some videos tonight of the Unit Coal Train 2A going WB.
You will see them later in the Sep 2023 Monthly Video Update
|
We ended the evening switching the first part of the Unit Coal Train 2A at Powder River Basin. |
Tue, Sep 5, 2023
No train activity today.
Wed, Sep 6, 2023
Jan had book club tonight so I worked on the RR.
Here's what I was able to accomplish
|
I removed all these characters from the employee stop platform. |
|
These are the three characters I will use to take their place. |
|
Here are the other characters which I will set at the three different engine facilities. |
|
Here are the three workers placed in such a way that they look like they are either coming or going. |
|
Here they are from the opposite view. |
|
A better picture of the steps leading to the CNW Engine Facility. |
|
I moved the locomotives around to make sure they fit either before or after the walk way down the middle. |
|
Since the steam platforms were too close to the walk- way I need to extend this platform for Track #6. |
|
I cut out the cork pieces on either side of the track. |
|
Using the hot glue gun, I secured the cork in place. |
|
Since the left side is the tarp paper to look like "asphalt" is dry I went ahead and weathered it. I won't be able to weather the right side of the track until the paint is dried. Hopefully overnight. |
See you in the morning...
Thu, Sep 7, 2023
Extending tracks 1 & 2 at UP Engine Facility
Also weathering Steam Engine platform...
|
There's not enough room at the end of Track 1 to fit the GP50 #53 between the bumper track and the "walk way". |
|
So, I extended both tracks 1 & 2. Now both SD60Ms can fit between the bumper and the "walk way" on track 2. And plenty of room on Track 1 for #53. |
|
Finished project - mission accomplished. |
|
I found this sign so I installed this in one of the bumpers for Track 1 right on the edge so viewers can read it. |
|
Finished ballasting. |
|
Now it's time to weather the extended platforms on Track 6. |
|
Time for dinner. I started the crosswalk for the maintenance workers going from one platform across the tracks to the other. |
Fri, Sep 8, 2023
This morning I was up early and finished the crosswalks across the tracks to both platforms.
|
What do you think of that? |
Later that same day...
I came home for lunch and put down some ballast on Track #6
|
BEFORE
|
|
AFTER |
|
Spraying on the water and then gluing down the ballast. |
|
Putting the platforms back in place. |
|
Time to put up the Track signage. |
|
I'm getting ready to build a fence. |
|
I added a tree and showing you where the fence will be installed. Along the sidewalk. |
|
Beginning the fence construction. |
|
Ready for the cross beams and then I'll cut it down on the top and bottom. The bottom I'll keep a few toothpicks long for the support posts. |
Later that day...
|
Laying down the glue for the cross beams. |
|
Laying the cross beams on the glue. Next Step: Let it dry overnight and then paint. |
Sat, Sep 9, 2023
It's a brand new day...and time for more fence work...
|
Cutting off the bottoms except the supporting posts. Almost finished cutting off the tops. |
|
All trim work complete. |
|
Front side facing the sidewalk. |
|
Ready to stain. |
|
Finished. Next step: Install the fence. |
|
I drilled the holes for the support posts. This shows the front of the fence towards the sidewalk. |
|
This picture shows the back of the fence with the cross beams facing the Engine Facility. |
|
A drone view of the newly installed fence. |
No comments: