Sun, Sep 10, 2023 thru Sat, Sep 16, 2023
Sun, Sep 10, 2023
![]() |
I did some switching today. First, I moved the 1960s train from the CNW yard to the UP yard. |
![]() |
I used power C3 CNW C40-8s to make the move. |
![]() |
I also pulled out Manifest Train 5D out on the mainline. |
![]() |
Finally, I have the Excursion Train 4A just ahead going WB. |
![]() |
And here's what it looks like on the Train Order Board. |
Making progress on the Train Order Board...FINALLY!
Mon, Sep 11, 2023
Train Day!
w/Rob Fair (6-8pm 2 hrs.)
Jordan Osborn (6:15-6:45pm .5 hr.) &
Marcus Thorsen (6:30-8pm 1.5 hrs.)
![]() |
Jordan and Rob cameo |
![]() |
Marcus & Rob Let's get to work. |
![]() |
Taking out the new old switch and will replace with brand new Atlas Code 100 #4 left hand switch from Rob. |
![]() |
Rob has to make some minor adjustments before installing Track 1. |
![]() |
He had to pull out the old track to put in the new track. |
![]() |
Making the minor adjustments. |
We didn't quite finish the project.
Rob texted me and said he would drop off a new 3' piece of flex track,
so we won't have to install two short pieces,
just one long piece.
Thanks a lot, Rob!
Tue, Sep 12, 2023
Laid the new track Rob dropped off today.
Check this out...
![]() |
Here's the 3' flex track Rob dropped off at my home today. |
![]() |
I took out the old track and will lay down the new track in this open space. |
![]() |
Cut to fit and it fits perfectly. |
![]() |
A look from the other direction. |
Much better!
Wed, Sep 13, 2023
Up early to get some work done on the RR...
![]() |
Cutting out a piece of cork to use as spacer between the old platform & the new track. |
![]() |
Using new hot glue gun to fit things in place. |
![]() |
New cork cutout section in place. |
![]() |
Painting new section AND installing Track signage. |
![]() |
Looking good. |
![]() |
Today I went to B&G and bought a new UP5 panel. Cost breakdown: Item $18.00 Tax $1.53 Total $19.53 |
![]() |
Tonight I came to the trainroom to ballast the new track I just installed. |
Thanks, Rob, for the new 3' flex track you dropped off on Tuesday.
Thu, Sep 14, 2023
I was up early again this morning...
![]() |
BEFORE weathering |
![]() |
AFTER weathering |
![]() |
AFTER vacuuming |
![]() |
I had a little hole here so I filled it with black cinders. |
![]() |
I also finished refilling the track with the same ballast. |
This evening a finished up the job at the UP Engine Facility
![]() |
BEFORE I moved the locomotives back into their "parking" places. |
![]() |
AFTER I moved the locomotives back into the "parking" places. |
Fri, Sep 15, 2023
No train activity
Sat, Sep 16, 2023
Big day with family, but after I got back home I had some time to chill in the trainroom...
![]() |
I finished running the last 3 laps after picking up a car at RIP Track 3. This picture shows the front of Train 5D heading eastbound. |
![]() |
This picture shows the middle of Train 5D heading EB. |
![]() |
I had two leftover cars that didn't fit the middle, so this shows where the last two cars are located at the rear of Train 5D heading EB. |
![]() |
I picked up the caboose and light-powered back to the UP Engine facility. |
![]() |
As I was heading home, I stopped and took a picture of the engine facility beyond the fence. |
This would be a cool back yard photo, wouldn't it?
One more project to finish...
![]() |
Look closely and you can see one bank of lights are out. |
![]() |
Not any more! The one post was missing a wire. |
![]() |
I added the wire and checked the lighting. It is now working and everything is back in order. |
No comments:
Post a Comment