Sun, Aug 6, 2023 thru Sat, Aug 12, 2023
Sun, Aug 6, 2023
More work on the lamp posts in UP Engine Facility...
|  | 
| Line 1 & 2 complete. Line 3 under construction. | 
|  | 
| Another view. | 
|  | 
| And still another view. | 
|  | 
| All the bottles I will use to support the lamp posts while the glue sets. | 
|  | 
| Line 3 now setting up. | 
|  | 
| Bottles in place supporting the posts. | 
|  | 
| Another view of the same. | 
|  | 
| Last view of the day. | 
Oh, I almost forgot...
Look what I found on my door step today...
|  | 
| I think I had to buy 4 packages of these lamp posts...here's the cost breakdown: Item: $12.99 S & H: $6.99 Tax: $1.10 Rewards: $3.24 Grand Total: $17.84 | 
Mon, Aug 7, 2023
I got up early this morning to take all the bottles down since the glue set overnight...
|  | 
| All the lamp posts are installed and ready for LED lights to be wired. | 
|  | 
| Another view... | 
|  | 
| ...and still another view. | 
|  | 
| How it looks with the locomotives back in place. | 
|  | 
| Gluing down the electrical downspout. | 
|  | 
| Trying to hide it from the front view. | 
Train Day!
w/Chris & Jordan Osborn 6-7:30pm 1.5 hrs.
Rob Fair & Marcus Thorsen 6-8:30pm 2.5 hrs.
|  | 
| Opening discussion around the tall round table. | 
|  | 
| Chris Osborn getting a close look at the details. | 
Click here to view tonight's action
Excursion Train 4A and 1960s Train 3A
Duration: 1 min. 12 sec.
|  | 
| Jordan also checking out the details. | 
|  | 
| Final group session. Very productive evening. | 
Marcus ran the Excursion Train 4A
ST1 4A 3 laps 75 mins.
Chris ran the 1960s Train 3A
C5 3A 3 laps 60 mins
Tue, Aug 8, 2023
|  | 
| I definitely DO NOT like the difference in the height of the lamp posts. Do you see it? | 
|  | 
| So I removed the 10 lamp posts I already installed. | 
|  | 
| The new length of the poles should be 3 1/4" | 
|  | 
| Here they are all adjusted to the same height as the others at the UP Engine Facility. | 
|  | 
| And the rolling stock I removed from last night's operating session. | 
|  | 
| One more look at the workbench. | 
Wed, Aug 9, 2023
|  | 
| I'm now reinstalling the lamp posts I just took out. | 
|  | 
| Almost finished. | 
|  | 
| Last four to go. | 
|  | 
| All in place, ready to apply the glue to the base. | 
|  | 
| Now the glue is in place, now it's time to spread it around so it will fill the cracks. | 
|  | 
| Some minor adjustments. | 
Thu, Aug 10, 2023
This morning I hooked up the new warning lights on the Powder River Basin bridge.
|  | 
| After you turn on the lights to PRB this warning light starts blinking in a few seconds. | 
|  | 
| Look what came in the mail today. Cost breakdown: Item: $13.98 S & H: $8.00 Tax: $1.18 Total: $23.16 | 
Fri, Aug 11, 2023
Putting the stairs and platforms together.
Wiring the lamps for UP Engine Facility
|  | 
| An added benefit of this order is the Engine Facility platform that also came with the stair steps. | 
|  | 
| 10 of the 19 positive side with resistors are installed. | 
|  | 
| Here are the 9 more. All of the "+" side (red) with resistors are ready for solder. | 
Tomorrow I will plan on soldering the positive side to resistors and 
also connecting the "-" or common (black) together. 
I may even get some of the lights to illuminate. 
Very cool!
That's for tomorrow...
Sat, Aug 12, 2023
After helping Ben & Katie move today, I had some time to work on the RR...
Here's what I accomplished, from 5-7pm:
|  | 
| The finished product. I have the lights wired for the UP Engine Facility. Yeah! | 
|  | 
| What it looks like underneath. The power source and all the wires connected to the (+) and the (-) side. | 
|  | 
| This is the underneath look at the "yellow" lights. | 
|  | 
| And this is the underneath look at the "white" lights. | 
|  | 
| I also rigged up a light source using a light Norm Zielke gave me quite a few years ago. | 
Thanks Norm!
 
Looking good, crazy amount of wiring !
ReplyDelete