Sun, Sep 18, 2022 thru Sat, Sep 24, 2022
Sun, Sep 18, 2022
|
Under the table, without lighting. |
|
Under the table with lighting and labels. These are the wires for the dwarf signals on the outer ridge of the Chicago Terminal Yard. |
Mon, Sep 19, 2022
Train Day!
w/Rob Fair 6-8pm 2 hrs.
|
Getting ready to mount the control panel for the Chicago Terminal dwarf signals. |
|
Drilling the holes for bolts for mounting.
|
|
Rob Fair is tightening the nuts to the bolts. |
|
One last turn. |
|
Here's how the control panel looks mounted on the layout facia. |
|
Rob is securing the Track Labels/lights to the layout. |
|
Counting out 1 minute for the glue to cure. |
|
Nice! Great job, Rob!!! |
Video of the finished product
Duration: 00:00.33 sec.
|
Rob Fair moving to the dwarf signals at the other end of the Chicago Terminal Yard. |
|
Securing the dwarf signals in place. |
|
I took this picture using my phone. |
|
I took this picture using Rob's phone. |
|
Dwarf signals for Tracks 8,7,& 6 lit up! |
|
Overall view looking north. |
Tue, Sep 20, 2022
Hopefully I can get the rest of the dwarf lights working this week.
Here's some progress from tonight...
|
First the red lights... |
|
Next, the green lights. |
Note: There are 5 working green lights, but only 4 working red lights.
UGH! I need to figure out why the red light on Track 4 isn't illuminating.
Wed, Sep 21, 2022
With all the RED & GREEN lights on looking east from Track 1 to Track 8
|
All RED |
|
All GREEN |
These next two pictures are looking west with all the Green (top) picture and all the RED (bottom) picture shown illuminated from Track 8 to Track 1
|
All GREEN |
|
All RED |
Thu, Sep 22, 2022
No train activity today.
I bought a new phone instead and had to visit the AT&T store twice to get it done.
Fri, Sep 23, 2022
Cleaned up Chicago Terminal and put the plastic protection panel back up.
|
The two ladies on the right are back in position. Ask Becca Berg for the story details if interested. |
|
Northwest Line Train 1A has arrived. Passengers begin their trek into the city. |
|
I finally put myself into the layout. That's me running after disembarking West Line Train 1C, Track 1, the first train from the West Line into the city.
|
|
Here's a look at the Chicago Terminal arrivals/departures. Oops, two fellas missed their track as Train 1D departs Track 3. |
|
It's Monday morning and here's another picture of me racing to work. I passed two gentlemen discussing weekend activities. |
|
The project is officially completed. I re-installed the plastic protective sheet today. |
Sat, Sep 24, 2022
Just a bit more accomplished on the RR...
|
Starting to work on the dwarf signal lights at the other end of the tracks. |
|
Here are the RED lights illuminated. |
|
And, of course, my work area. Tools of the trade... |
You did a great job on the lights. Rob
ReplyDelete