Sun, Mar 20, 2022 thru Sat, Mar 26, 2022
Sun, Mar 20, 2022
No train activity today.
Mon, Mar 21, 2022
Train Day!
w/Rob Fair & Jordan Osborn
6-8pm 2 hrs.
Did some work, ran some trains, had some fun...
Our first order of business is to take care of Crossover Switch #3. Well done, Mr. Rob. |
Picking up 2 cars that were left behind during Train 5D classification |
Finishing touches on putting Train 5D back in order
Duration: 00:00:05
Pulling Four Road Power Engines all
GP38-2 for 1960's Train 3A
Duration: 00:00:30 sec.
Finished attaching the caboose to the end of Train 3A
Duration: 00:00:30 sec.
After connecting caboose to end of train,
Light Power Runaround to front of EB Train 3A
Duration: 00:00:18 sec.
Connecting Road Power to 1st Car on Train 3A
Duration: 00:00:00 sec.
Pulling Train 3A out of Proviso Yard CNW Track 2
Duration: 00:00:15 sec.
Making the 2% climb right out of the yard
Duration: 00:00:34 sec.
Rounding the bend after Oak Park Marion Street
Duration: 00:00:19 sec.
Train 3A rumbling through Geneva
Duration: 00:00:31 sec.
Finally, some feeder wire work under
California Avenue Maintenance Facility
Duration: 00:00:31 sec.
Tue, Mar 22, 2022
Finished putting away 1960's Train 3A into PYUP Track 2.
I didn't need to split up the train so I have PYUP Track 3 still open.
Wed, Mar 23, 2022
At the workbench today...
I had a few cars that need some attention. |
After putting them through inspection, I transfer the Inspection report to the RIP Track section to prepare for the Test Run. |
Here are the two cars waiting at RIP Track 3 for the next Test Train. |
Thu, Mar 24, 2022
More work at the workbench...
It's funny how once you get started, it's hard to stop. |
I need to finish these two cars. |
As soon as these cars are finished they'll join the others at the RIP (Repair In Place) Tracks. |
Fri, Mar 25, 2022
Since this car had couplers mounted to the truck, I had to remove the couplers from the trucks, and add them to the body. I had to remove the middle piece and add the outer pieces to the end of the car. |
Here's the car with the middle piece gone and the draft gear box attached for the coupler. |
These are two other cars I'll be working on today and tomorrow... |
Sat, Mar 26, 2022
Finishing up the car from yesterday. Now I've added the couplers to the draft gear box and attached the cover. |
The cars I've been working on the last few days are now ready for the TEST Train. |
My goal this week was to finish getting all the cars in the cubbies ready for service. |
Workbench is cleared. |
These are all the cars I put through inspection and adjusted accordingly. |
Each car has it's own separate Inspection Report. |
Sweet, looking really good
ReplyDelete