Sun, Nov 28, 2021 thru Sat, Dec 4, 2021
Sun, Nov 28, 2021
Working on the RR...
I figured out a way to wire up the lights. I will use the valances to attach a metal strip to solder the (+) to one side and the (-) to the other. I think that should work just fine! |
I don't like the clear orange look so I'm going to paint the one side a metal silver color. |
That looks a lot better, don't you think? |
Here are the valances in place. |
Other side... |
Now to figure out how to attach the wires. |
A closeup of the soldered wire to the metal bar which will provide the power to the LED lights. I will use the red for (+). |
And here is the orange wire attached to the other valance I'll use for (-). |
This project will take a few more days, unless Rob gets it done tomorrow. We'll see...
Mon, Nov 29, 2021
I got up early this morning and did some work on Oak Park Marion St./Lombard station...
I soldered the two metal bars together at the center point. |
This shot is a little clearer than the first. |
I also put up a "wall" in case the coal train car wants to jump the tracks again. This should prevent the car from hitting the concrete floor. |
Train Day!
w/Jordan Osborn
6:15-8:15pm 2 hrs.
Milt and Rob couldn't make it tonight.
We started tonight off with some selfies...
WAIT! Where are the trains in the background? All I see are the ceiling rafters. |
That's a little bit better, but I still can't see the trains. |
All right, that should do it. |
Jordan will take the Excursion Train 4A out on the mainline tonight. |
Pulling the Power B6 from the UP Engine Facility Track 5. |
Getting ready to hook up the excursion coaches
Duration: 00:00:29 sec.
Pulling out WB Excursion Train 4A
Duration: 00:00:30 sec.
Power B6 Steam CB&Q 2-10-2 does a runaround
Duration: 00:00:30 sec.
Finally ready for departure
Duration: 00:00:31 sec.
A rare shot of Jordan out in the field helping with maintenance. Here he is getting the Intermodal train ready for departure onto the mainline. |
Intermodal Train 2B heading WB Track 1
Duration: 00:00:14 sec.
Approaching Proviso Yard on the mainline - Part 1
Duration: 00:00:30 sec.
Running through Proviso Yard on the mainline - Part 2
Duration: 00:00:30 sec.
Passing Geneva Station - Part 1
Duration: 00:00:36 sec.
Passing Geneva Station - Part 2
Duration: 00:00:29 sec.
End of the line - call it a day
Duration: 00:00:32 sec.
Whew! Full Day!
Lots of fun tonight - very few derailments and mishaps - even for the intermodal train which had been a regular occurrence up to tonight.
Tue, Nov 30, 2021
Installing lights at Oak Park Marion St./Lombard station
The first of 5 lights installed. |
A view from trackside. |
Dang! The focus is on the tracks not on the hook I installed to hold the light wires in place. |
Well, this is better. It shows the loop that holds the wires in place. Hopefully the glue will hold and I'll check in the morning to make sure it set. |
Wed, Dec 1, 2021
I got up extra early this morning and did some work on the RR...
5:30-5:45am 15 min.
I finished the lights over the station signs. |
Nice and bright. Should stand out in the crowd. |
Close up of the staple I bent to shape into a bracket to hold up the light fixture. |
My Goal today is to finish the lights at the Oak Park Marion St./Lombard station.
And I did! Check this out from 6:30-7pm 30 min.
Trackside view of the lights over the station signage. |
Overhead view of the wiring of 4 of the 5 lights. Two on the left, one in the middle and 1 of 2 on the right. |
I didn't want the wiring to show through the glass ceiling so I painted the roof silver. |
I think that will work, don't you? |
Not so clear on a foggy night. |
Really disappointed that this shot didn't show up better. It looked great on my phone after I took the picture. Oh well, that's what you get when you use sub-par equipment. |
Hey! This is the picture I was talking about in the previous picture caption. It's still not as crisp as I'd like, but this is much better than the other. Would you agree? |
An interesting thing happened with the lighting tonight.
The 2 lights on the left were very bright and the three lights on the right were dim.
Why?
I figured it out.
The "bridge" I soldered on the (+) side was inefficient.
I took a short piece of wire and trimmed both ends. I soldered this wire to connect both metal strips.
After I finished the soldering I turned on the power and everything was well-lit!
YES!
Thu, Dec 2, 2021
I finished connecting the new station LED lights to the mobile light switch at the Control Tower
Check out these action videos...
"Hey, Everybody! I got the lights working!"
Duration: 00:00:29 sec.
Watch how the lights dim when I shut them off
Duration: 00:00:11 sec.
Fri, Dec 3, 2021
No Train Activity today.
Sat, Dec 4, 2021
I asked Jordan to stop by today to finish putting away the Excursion Train 4A
Jordan at the controls ready to take the Excursion Train 4A back home. |
Excursion Train 4A entering the Proviso Yard Union Pacific (PYUP) side for it's final approach. |
We dropped off the coach cars. |
Then, in the new tradition, we coupled the caboose to the locomotive and brought it back to the Engine Facility for storage. |
No comments:
Post a Comment