Sun, Jun 27, 2021 thru Sat, Jul 5, 2021
Sun, Jun 27, 2021
Josiah Crockett putting away Thomas into the round house. |
Josiah is ready to say, "Play with me." I replied, "No, I'd rather watch you play." Josiah played on... |
Mon, Jun 28, 2021
Train Day!
w/Rob Fair 6-8pm 2 hours
Lots accomplished tonight...take a look...
Tonight our goal is to install crossover 2.5 - see Project Priority List Item A |
While Rob works on the crossover, I'm going to work on wiring up the trucks at PRB. |
I'm going to start with this one at the Coal Plant. |
Rob making progress. One section of the mainline removed. Ready to install the first switch. |
Rob Fair installing the first switch of crossover 2.5 |
Rob Fair using the Dremel tool to cut the rails.
Length: 00:00:10 sec.
I'm adding the lead wires to the truck lights. |
Back at crossover 2.5 where Rob has removed the mainline and ready to install switch #2. |
YES! Rob was able to finish the project tonight! Nice work, Rob!!! |
Another perspective. |
Tomorrow I'll wire them up and let you decide.
Tue, Jun 29, 2021
Connecting the feeder wires to the light wires on the PRB bridge truck. |
Connected the truck lights to power to show you what it looks like all lit up. |
Testing the look of the PRB bridge truck with the headlights on. |
Illuminating the headlights of the truck on the PRB bridge
Length: 00:00:27 sec.
Checking the porch lights at the workbench. |
Video at the Workbench
Length: 00:00:21 sec.
What to do about the wiring...
BEFORE
Length: 00:00:23 sec.
Instead of doing all the wiring under the layout, I decided to make it easier on myself by doing all the wiring above the layout and use the building to hide all the connections. |
Testing my wiring. Not good. I'm going to need to make some changes. |
Night Scene
Length: 00:00:27 sec.
How I did the wiring...
AFTER
Length: 00:00:29 sec.
Wed, Jun 30, 2021
Stopped at B&G today to pick up the under-table switch machines
Now I need to figure out how to connect the wires. Time to put on my detective hat. |
The cost of the two switch machines. |
Here's the photo of the new way to connect the wires. The following video explains what I'm doing... |
I figured out a way to connect the wires
Length: 00:00:31 sec.
Thu, Jul 1, 2021
Getting ready to wire up Crossover 2.5 |
Switch Machine in place, now it's time to figure out how to wire this pup up. |
What do the lights look like at night?
Length: 00:00:27 sec.
New wiring arrangement. This was sooooo much easier than trying to wire everything up from underneath the layout. |
Another view... |
Close up of the copper strips used to hold the (+) red wires and the (-) green, white, black wires. |
Night scene #1 |
Night scene #2 |
Fri, Jul 2, 2021
Getting ready to install "asphalt" around the Coal Plant. |
"Asphalt" installed with glue. Now we wait for the weights to hold it in place. |
Weights removed and there you have it! Still need to figure out what to do with the space between the "asphalt" and the edge of the facia. |
SPECIAL GUESTS
Sat, Jul 3, 2021
Working on the highway next to the Coal Plant. |
I needed 1/2" to insert as a "filler". This sheet came from Chrissa Osborn, my neighbor. |
"Filler" piece in place. |
Time to install the road. |
Great progress ! ! ! !