Sun, Jun 6, 2021 thru Sat, Jun 12, 2021
Sun, Jun 6, 2021
I've finished about half the sheets for operations. This sheet shows the steps taken to run a commuter train. |
This sheet shows the Power assigned to Trains and their storage locations. It also gives details about Yard capacities and explains the codes. |
Mon, Jun 7, 2021
Still working feverously on the operations spreadsheet...
I think I've figured out a system to run trains and track progress. |
Arrived Harvard IL aka PRB. Again, I'll be using the same location for two physical spots. |
Returning in PUSH mode back to Chicago Terminal. |
I have two Northwest Line trains that will run back and forth from Chicago to Harvard.
I'll also have two West Line trains that will run back and forth from Chicago to Geneva.
Tue, Jun 8, 2021
No train activity today.
Wed, Jun 9, 2021
Ran another commuter train tonight. This time a West Line train A32.51C Chicago to Geneva. |
Here's a video of that same train running through Proviso Yard
Thu, Jun 10, 2021
Fri, Jun 11, 2021
Connie & Mick Meyer Mick is Jan's brother. |
Sat, Jun 12, 2021
After about two weeks of work, I have finally finished the paperwork for operations.
These two sheets are the bread & butter, the nitty gritty, the core ingredients of operations.
I will use this one to track the power and trains to see which road power is "up" next. |
And this sheet, lays out the road power with switchers and the possible trains that each can pull/push. |
More to come...
No comments:
Post a Comment