Sun, Dec 27, 2020 thru Sat, Jan 2, 2021
This Week's Goals
1. Continue work on Clinton Ave. wall sections
Progress: Need to purchase more parts...
2. Continue work on California Ave. Coach Yard entrance off Sacramento Blvd.
Progress: Continue working on this and maybe finish during Week 335
3. More Weathering Locomotive Roster
Progress: Continue on CNW fleet - one finished more to go...
4. Coming soon: Work on streets/parking lots in Industrial Park
Progress: Concentrating on Goal #2 this week, will tackle this next year.
Sun, Dec 27, 2020
James, Natalie, Josiah and Lissette came out today for a few days.
Josiah said, "Let's go downstairs to trains."
I said, "OK." :)
We played a bit with Thomas the Tank Engine. |
And then we set up the infamous oval track. |
We got a train running...check this out.
Length: 00:00:20 sec.
Mon, Dec 28, 2020
Before Train Day, Josiah and I had some train time
Length: 00:00:20 sec.
Train Day!
with Rob Fair and Jordan Osborn
6-8pm 2 hrs.
Jordan Osborn greeting our arrival. |
Rob Fair checking messages. |
We'll be running some trains tonight. First step, take the well car in the train shown and add to intermodal train. |
Metra Commuter Train heading to Chicago
Length: 00:00:30 sec.
Rob Fair continues work on Goal #2. He's adding the wood work around the edges. |
The AC6000 is putting together the intermodal train. Once it's ready it will depart Proviso Yard. Destination: Global 1. |
Length: 00:00:06 sec.
Intermodal Train arriving at Global 1
Length: 00:00:14 sec.
Work continues on the Sacramento entrance of Metra California Avenue Maintenance Facility. |
Moving piggy-back cars from Global 1 to Global 2. |
Piggy-back train on the move to Global 2. |
I think the sign is too large. I will re-print and re- set the sign with better proportions. |
The hardest part in this step is finding the dang end. |
After taping the gaps between the foam board, we covered with first layer of filler sand. |
Final picture of the night. |
Tue, Dec 29, 2020
I'm preparing paperwork for running trains next week during our first ever Operating Session! |
Progress on the Sacramento Rd. Entrance to California Ave (UP/Metra) Coach Yard (Note name change, from "Maintenance Facility" to "Coach Yard"). I made the change after re-reading the sign. |
Wed, Dec 30, 2020
Materials ready for gluing on the top coat. |
Sand filler in place. |
Top layer in place. |
Top layer now in place and waiting for glue application. |
Thu, Dec 31, 2020
This morning...
Glue now in place waiting for it to cure. I used an eye dropper with 50/50 glue/water mix with a squirt of liquid dish detergent |
Same for section near the road that will meet the lift-out section. |
This afternoon...
I'm going to paint the concrete this afternoon. |
Going around the bend in a minute. I'll take a finished shot tomorrow after weathering and letting the paint dry. |