Sun, Nov. 22, 2020 thru Sat, Nov.28, 2020
This week's goals:
1. Continue work on CNW Power House
Progress: Now working on the back and the side.
2. Install lights on CNW Powerhouse chimney
Progress: Train Day! Project
3. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
Progress: Not Started
Sun, Nov. 22, 2020
Cleaned Main line track 1 tonight. |
Mainline track on right has been cleaned. |
Mon, Nov. 23, 2020
Train Day!
w/Rob Fair 6-8:15pm 2.25 hrs.
and Jordan Osborn 6:15-7:45pm 1.5 hrs.
Here's what we did tonight.
A little of this and a little of that...
Jordan Osborn showing us his new phone. He was sooooo excited! |
Rob Fair starts the night at the workbench. His job tonight will be to install the lights on the CNW Powerhouse chimney. |
I didn't do anything different.
Oh well...sorry :(
Length: 00:00:23 sec.
Length: 00:00:23 sec.
I installed the toggle switch for the engine track. |
I also drilled the hole for the wires to light the CNW Powerhouse chimney. |
Rob Fair making progress on light installation. |
Jordan worked on his phone tonight. Just good to have him with us as we work. |
I also installed the toggle switch for the other engine track at the end of the yard. |
CNW Powerhouse chimney in place but not installed. |
Tue, Nov. 24, 2020
I wired up the main line track heading into the Powder River Basin. |
sideways videos. I have no idea why this is happening...
Length: 00:00:29 sec.
Length: 00:00:29 sec.
I was pretty excited about getting this done tonight.
Wed, Nov. 25, 2020
Concentrating on organization and clean-up this week...
Thu, Nov. 26, 2020
Happy Thanksgiving!
Fri, Nov. 27, 2020
Before the family comes out for Thanksgiving today I wanted to run the main entry to the Powder River Basin all the way to the wall. |
I also wanted to straighten up my workbench. It has been neglected long enough. |
Josiah and I put some trains together. Note the coupling tool he is about to grab. |
Before the family left I wanted to have Joshy come and help me run some trains.
I put together this video to capture the moment.
I hope you enjoy it.
Sat, Nov. 28, 2020
A little of this and a little of that...
Since the chimney base isn't even ground level, I needed to make the level ground even. |
I found a piece that I can use for the base of the chimney. |
After putting in a piece of "asphalt" for leveling I glued the pieces in place, weighted down the pieces and now I wait. |
While that sets, I've been having problems switching off the power at the Central Command Center. I tested the battery and found it was a little low. Instead of a full 12v it was only 11.5v. |
I also took some time to take Josh's PRB coal train and park it at the Melrose Park Power Plant. |
I brought it in at night and did all the switching under the stars. Here's another view of the finished assignment. |
This Week's Goals Progress Report:
1. Continue work on CNW Powerhouse
Progress: Now working on the back and the side.
2. Install lights on CNW Powerhouse chimney
Progress: Installed light fixtures, next up: Wire them up!
3. Begin work on California Ave. Metra Maintenance Facility entrance off Western Ave.
Progress: Not Started
No comments: