Sun, Feb 24, 2019 thru Sat, Mar 2, 2019
Sun, Feb 24, 2019
Before heading to Chicago I worked on Chicago North for about 1 hour. Here I'm preparing to cut and then glue down the "asphalt". |
Getting each section cut out. |
Cut out complete, now it's time to weigh it down for the glue to set overnight. |
Mon, Feb 25, 2019
Train Day!
w/Rob Fair 6-8pm 2 hrs.
w/Rob Fair 6-8pm 2 hrs.
I got up this morning to glue in the final section. This will set all day and then I'll remove the weights tonight for Train Night. |
Rob Fair came tonight and we glue the LED bridge lights back in place. |
The LED are facing down. They should be facing out. |
After fixing the LED strips, Rob Fair began cutting out the sidewalks for Chicago North. |
I stayed back in Chicago and will work on the piping from north to south. |
First, I'll paint the face of the bridge. |
Next I'll cut up the sprues and make the piping. |
I'll try to get a close up shot of the work I did tonight, but this shot really shows the sidewalk pieces Rob Fair worked on tonight. |
Tue, Feb 26, 2019
I had some time to work on the RR where we left off yesterday...
I removed the "pipes" and layed them out to be glued at their joints. |
Look closely and you can see the spikes that hold up the "pipes" on the bridge facia. |
Wed, Feb 27, 2019
Train Day!
w/Dean Hatzis, Cam Passaglia (4-5:15pm 1.25 hrs.) & Jordan Osborn (4-5pm 1 hr.)
First thing this morning I went to the train room and painted the "pipes". I will install these on the bridge facia tonight during our train session this afternoon. |
Jordan Osborn and Cam Passaglia prepare for the day. |
Cam is using his "torch" to spot check the lean in the intermodal cars. Cam does a great job getting into the details... |
Here he moves into position to get a good overhead view. |
Dean Hatzis works on removing the fascia trim to install a piece of plexi-glass that will protect 25th Avenue bridge. |
Dean Hatzis secures a 2x4 filler piece that will bring out the facia trim. |
Jordan Osborn is preparing to depart for game time at home. He leaves the engineer duties to a very relaxed and confident Jr. Engineer, Cameron Passaglia. |
Cam keeps his eye on the intermodal train. We had multiple "issues" with this train tonight. |
Cam's trouble shooting intermodal train.
Cam points out the exact location of this particular issue. |
The first photo this morning shows the painted "pipes". Here are those same pipes now installed on the bridge facia. |
Thu, Feb 28, 2019
Time to glue down those "floating" sidewalks... |
Lots of weights at various points to allow the glue to set in place. |
Once glue set, it's time to paint the sidewalks their concrete color. |
Painted |
Finished product. Now it's time to cut out the sidewalks for the middle section. |
Fri, Mar 1, 2019
Flying to Boston MA for Richie Kaknes wedding to Kelsey Burke
Sat, Mar 2, 2019
Today is the wedding day.
No comments:
Post a Comment