Monday, May 18, 2026

Week 616

Sun, May 17, 2026 thru Sat, May 23, 2026

Sun, May 17, 2026

Running Sequence Train #17 Metra Commuter Train 1D EB Geneva to Chicago Terminal

No pictures/videos

Mon, May 18, 2026

Train Day!
w/Rob Fair 6-8pm 2 hrs.

Running Sequence Job #20
Running Metra Commuter cars from Chicago Terminal to California Avenue Metra Maintenance Facility Coach Yard

Just a few mishaps tonight. Overall the session
was very successful.

Rob worked the UP GP15-1 1612 locomotive at
the California Avenue Maintenance Facility (CAMF)

I shuttled the cars from Chicago Terminal (CT) and then
Rob will pick them up on Yard Track 1 to place them
in the Coach Yard (already four sets of cars in place)

After moving all the cars in consists from CT to
CAMF Coach Yards we reversed the process to bring
them all back to CT. Here SW1500 Switcher 1064 
pushes the last cars in consist back to CT.

In between the two sessions we recalibrated all switcher locomotives to run smoother and slower while they do their work. We were quite satisfied with the results. We did have to tweak a few of the locomotives to make them run a little faster since they were running way too slow.

Tue, May 19, 2026

I updated a couple more switcher locomotives for speed controls.
I also updated the paperwork for each locomotive.

I used the yellow pad for marking the changes.

Then I took those changes and updated each loco's
paperwork sheet in my locomotive maintenance & repair
3 ring binder

Now we need to update the two locomotives I didn't
touch yesterday. 4400 & 1518

Updating CNW GP-9 1518

v-start CV 02

Set to 026

Check out the video in the Weekly Layout Update
to see how these respond now.

Wed, May 20, 2026

Sequence Job #21 Moving IP cars from manufacturing
plants to the transfer track.

Using SW2 UP B40-8 1803 to pick up IP cars

Two cars at the warehouse buildings.

Two cars at the manufacturing plants.

Two cars at the Grain Elevator

Retrieving the cars from the grain elevator

Transfer Train on its way to WeGo Yard Trk 1

Also returned the empty coal cars to MPPP

Six cars arrived and ready for shuffling at
WeGo Yard Trk 1

Thu, May 21, 2026

Traveled to Chicago to help Natalie

Fri, May 22, 2026

Updating Cars in Consist manifest sheets for Industrial Park Transfer Train (IP - TT)

Sat, May 23, 2026

More paperwork updates for Industrial Park Transfer Train job.

I'm updating the Timeline spreadsheet for Saturday's
entry.

The Industrial Park - Transfer Train job is split
into three (3) sections.
Section 1 is the trip to the WeGo Yard from the
IP - Transfer Track.

Section 2 is the WeGo Yard Car Order Job.
This will be done by SW4 UP GP15-1 1612

Section 3 is the Proviso Yard Switchers coming to
pick up the cars which are in train order and bring
them back to put in the correct train order at Proviso.

 Click here
to view the Weekly Layout Update
YouTube Video
Duration: 07:31 min:sec

Description

What's ON Track this Week?

*Rob Fair working California Avenue Maintenance Facility Yard
*Changing CV numbers for Switcher locomotives
*Moving Commuter Cars
*Industrial Park - Transfer Train (IP-TT) lots of paperwork updates
*Switching cars at the Industrial Park to prepare for Transfer Train
*IP-TT arrives at WeGo Yard Track 1
*Final manifest cars in consist paperwork update.
*Thanks for watching and for commenting!

No comments:

Post a Comment