Sun, May 17, 2026 thru Sat, May 23, 2026
Running Sequence Train #17 Metra Commuter Train 1D EB Geneva to Chicago Terminal
No pictures/videos
Mon, May 18, 2026
Train Day!
w/Rob Fair 6-8pm 2 hrs.
Running Sequence Job #20
Running Metra Commuter cars from Chicago Terminal to California Avenue Metra Maintenance Facility Coach Yard
![]() |
| Just a few mishaps tonight. Overall the session was very successful. |
![]() |
| Rob worked the UP GP15-1 1612 locomotive at the California Avenue Maintenance Facility (CAMF) |
![]() |
| I shuttled the cars from Chicago Terminal (CT) and then Rob will pick them up on Yard Track 1 to place them in the Coach Yard (already four sets of cars in place) |
![]() |
| After moving all the cars in consists from CT to CAMF Coach Yards we reversed the process to bring them all back to CT. Here SW1500 Switcher 1064 pushes the last cars in consist back to CT. |
In between the two sessions we recalibrated all switcher locomotives to run smoother and slower while they do their work. We were quite satisfied with the results. We did have to tweak a few of the locomotives to make them run a little faster since they were running way too slow.
Tue, May 19, 2026
I updated a couple more switcher locomotives for speed controls.
I also updated the paperwork for each locomotive.
![]() |
| I used the yellow pad for marking the changes. |
![]() |
| Then I took those changes and updated each loco's paperwork sheet in my locomotive maintenance & repair 3 ring binder |
![]() |
| Now we need to update the two locomotives I didn't touch yesterday. 4400 & 1518 |
![]() |
| Updating CNW GP-9 1518 |
![]() |
| v-start CV 02 |
![]() |
| Set to 026 |
![]() |
| Check out the video in the Weekly Layout Update to see how these respond now. |
Wed, May 20, 2026
![]() |
| Sequence Job #21 Moving IP cars from manufacturing plants to the transfer track. |
![]() |
| Using SW2 UP B40-8 1803 to pick up IP cars |
![]() |
| Two cars at the warehouse buildings. |
![]() |
| Two cars at the manufacturing plants. |
![]() |
| Two cars at the Grain Elevator |
![]() |
| Retrieving the cars from the grain elevator |
![]() |
| Transfer Train on its way to WeGo Yard Trk 1 |
![]() |
| Also returned the empty coal cars to MPPP |
![]() |
| Six cars arrived and ready for shuffling at WeGo Yard Trk 1 |
Thu, May 21, 2026
Traveled to Chicago to help Natalie
Fri, May 22, 2026
Updating Cars in Consist manifest sheets for Industrial Park Transfer Train (IP - TT)
Sat, May 23, 2026
More paperwork updates for Industrial Park Transfer Train job.
![]() |
| I'm updating the Timeline spreadsheet for Saturday's entry. |
![]() |
| The Industrial Park - Transfer Train job is split into three (3) sections. Section 1 is the trip to the WeGo Yard from the IP - Transfer Track. |
![]() |
| Section 2 is the WeGo Yard Car Order Job. This will be done by SW4 UP GP15-1 1612 |
![]() |
| Section 3 is the Proviso Yard Switchers coming to pick up the cars which are in train order and bring them back to put in the correct train order at Proviso. |
Click here
to view the Weekly Layout Update
YouTube Video
Duration: 07:31 min:sec
Description
What's ON Track this Week?
*Rob Fair working California Avenue Maintenance Facility Yard
*Changing CV numbers for Switcher locomotives
*Moving Commuter Cars
*Industrial Park - Transfer Train (IP-TT) lots of paperwork updates
*Switching cars at the Industrial Park to prepare for Transfer Train
*IP-TT arrives at WeGo Yard Track 1
*Final manifest cars in consist paperwork update.
*Thanks for watching and for commenting!
























No comments:
Post a Comment