Sun, Mar 16, 2025 thru Sat, Mar 22, 2025
Sun, Mar 16, 2025
Working on Weekly Layout Update video
to view
Weekly Layout Update YouTube video for Blog 554
Duration: 03:15 mins.
Mon, Mar 17, 2025
Train Day!
We're going on a Field Trip to Milton Feryrance's home tonight!
![]() |
But before we go, I need to pull some wires for the Clinton Street traffic/crosswalk lights. |
![]() |
My workspace for the project to make sure every- thing works as it should. |
![]() |
Look what came in the mail today for Z-Stuff for Trains. These are tabs for the signal bridges to help with the sensors. |
![]() |
At Milt Feryance's home. That is Milt on the left, and then Rob and Marcus left to right. |
![]() |
More discussion on history and how Milt got started with his train collection and passion. |
I took several videos of our session.
See Saturday's entry for action on Milt's layout.
![]() |
After I got home I installed the dots that came earlier in the day. Here is Signal #4 |
![]() |
Signal #3 |
![]() |
Signal #2 |
![]() |
Signal #1 |
I'm anxious to see if these dots really do solve my operating problems.
Sometimes the lights change and other times they do what they want.
More to come...
Tue, Mar 18, 2025
No train activity today.
Wed, Mar 19, 2025
Working on the RR...
![]() |
This is my sample set up. Later, I will show the new wiring set up. |
![]() |
In the meantime, let's work on the signage. The model sits on top of the prototype to see if it matches. |
![]() |
I think this will work. |
![]() |
The tricky part for this section is the street sign in the middle of the two traffic arms. |
![]() |
I wasn't sure where to place the traffic street ID sign. So I moved the "No Left Turn" sign and put it in between. |
![]() |
No match on the prototype but I had to display the street ID so this was my solution. |
![]() |
Here's the new wiring. Rob Fair brought over some colored wire for me to finish this project. "Thank you Rob!" |
Thu, Mar 20, 2025
More work on traffic signals & signage...
![]() |
Adding single signal & crosswalk with signs on the right. |
![]() |
Also added signage to the single signal and crosswalk to the left at Washington Street. |
![]() |
More signage - this time at W. Randolf Street. |
![]() |
Continuing work on wiring the controller. |
Fri, Mar 21, 2025
![]() |
One last signage to install on traffic signal. |
![]() |
Opening session at Tom Stover's. l.tor. Bill, Tom, John, Carl, Glynn, Duane |
![]() |
I spent the opening round here at the dispatcher's office. |
![]() |
Red Cliff before entering Salt Lake City or the Tunnel. |
![]() |
Denver Yard. Glynn at the controls with Tom giving the assignments. |
![]() |
Our next break. Carl Ball retired in 2000 as the Sante Fe Police Chief |
![]() |
Back at home. I added all the wires and mounted the controller for the traffic signals. WITHOUT FLASH |
![]() |
Here's the same controller. WITH FLASH |
Getting closer to seeing some action up above.
Sat, Mar 22, 2025
Time to start installing the signals...
![]() |
First I need to install the Clinton Street sign at Randolph |
![]() |
And the Clinton St. sign at Washington Street. |
![]() |
Here they are installed at Washington Street. Just the right side is installed. Still need to install the left side. |
![]() |
Here's the prototype photo that matches the model. |
![]() |
That took just under 1 hour. |
To view action videos of this week's blog
Season 2025 Blog 555
Duration: 06:09 minutes
Description
What's ON Track this Week?
1. Field Trip to Milt's O & G scale layout in Saint Charles IL
2. Operating Session at Tom's in Elburn IL
3. Project Overview - Traffic Signals at Washington Street
4. Thanks for watching!
No comments:
Post a Comment