Sun, Feb 9, 2025 thru Sat, Feb 15, 2025
Sun, Feb 9, 2025
Special Guests
![]() |
Glynn Amburgey stopped by to get some shots of trains running. His wife said, "I like to see trains running." So now Glynn makes sure he takes some videos of trains running. |
to view his YouTube video of trains running today
Duration: 31:42 minutes
Another special guest stopped by today.
Jonathan Paul Cooper
![]() |
Oops! I caught him with his eyes closed. Let's try again. |
![]() |
There we go! Much better. |
Jonathan is a distant relative so it was great to run trains and get caught up on our lives.
We promised to meet up again after some further progress on the RR.
Mon, Feb 10, 2025
Train Day!
No one came today.
Just me.
I did have a full weekend so am very pleased with the results of the weekend and tonight.
![]() |
Tonight I will move the mainline train into the Powder River Basin (PRB) East Yard |
![]() |
2/3 of the way to completion. |
![]() |
These last few cars need to be placed and I'll be finished. |
![]() |
That took just under 1 hour. |
![]() |
One last look at the finished product. |
![]() |
Cars already loaded with coal and ready to be switched to the PRB West Yard. |
![]() |
I had some spotty performances due to dirty track so I took a few minutes to polish the rails. |
![]() |
I even cleaned the yard tracks. |
Tue, Feb 11, 2025
![]() |
I stopped by B&G Train World today and bought these items |
![]() |
Two more decoders for the CNW C40-8 locomotives |
![]() |
Cost Breakdown: Wheaton Station: $35.95 Guard Rails (x6): $7.25 Tax: $3.67 Scenery Total: $46.87 Digitrax Decoders x2: $48.00 Tax: see above DCC Total: $48.00 |
Wed, Feb 12, 2025
![]() |
BEFORE Getting ready to build the Wheaton Station. |
![]() |
AFTER cleanup and placement of corner buildings plus the black footprint of Wheaton Station in place. |
![]() |
Also organized some signage that has been laying around doing nothing for many years. |
![]() |
I will eventually repair some of these and then cut them to fit signs and then install them around the layout. |
![]() |
Jack Fischer visited the layout last Friday and suggested this scene. "Put a cement truck there and fix that stop step." Good idea. Scene Complete! |
p.s. Don't ask me how the cement truck got there.
Thu, Feb 13, 2025
No train activity today.
Fri, Feb 14, 2025
![]() |
Today I'm going to start to prepare the Wheaton Station model |
![]() |
Roof parts |
![]() |
More light in the dining room so this will be my new workspace. |
![]() |
Cutting out each section and using a file to smooth out the edges |
![]() |
Ready to start painting and then assembling. |
Making progress...
Sat, Feb 15, 2025
Special Guests
Tony Passaglia and his son, Cameron
![]() |
Tony & Cameron visiting the railroad |
![]() |
Cameron at Central Control Tower |
![]() |
Tony got his hands dirty fixing Metra F40PH #132 THANK YOU, Tony! |
![]() |
Doing the QC after the fix. |
Later that day...
Progress on Wheaton Station
![]() |
Window panes installed |
![]() |
Station wall details installed. |
I decided not to paint, but I will weather to remove "plastic" look.
to view
YouTube Weekly Layout Update Video
Season 2025 Blog 550
Duration: 03:39 minutes
Description
What's ON Track this Week?
Switching Unit Coal Train 2A at Powder River Basin East Yard
Saturday Special Guests Father/Son Combo
Amtrak Train led by F40PH #132
Amtrak Train arrives Track 5 Chicago Terminal
Detail drawing book (1 sec.)
Tony Trouble Shoots Metra Loco F40PH #132
No comments:
Post a Comment