Sun, Oct 20, 2024 thru Sat, Oct 26, 2024
Moving the intermodal well cars back to Global 1
after Rob's project which is now finished.
|  | 
| I'm going to move all these intermodal well cars back into their positions at Global 1
 | 
|  | 
| Using the Global 1 switcher to do the job. | 
|  | 
| All the cars are behind the switcher and ready to be backed into Global 1
 | 
|  | 
| Almost ready to back up the first section into place. | 
|  | 
| As soon as we pull the back of this train through the yard we'll be able to back up the train into Global 1
 Track 5
 | 
|  | 
| Before we do that, we need to drop of the car with the EOTD
 | 
|  | 
| This is the back section of the train in place on Track 5. | 
|  | 
| The next section is now in place on Track 4 | 
|  | 
| finally all the sections are fully in their positions at Global 1
 | 
|  | 
| One more view of the entire fleet. | 
|  | 
| I'm going to mark down 1 hour for this project. | 
Mon, Oct 21, 2024
Up early to clean up the workbench
|  | 
| With Rob's Intermodal Project finished, I need to tidy up the workbench.
 | 
|  | 
| Much better wouldn't you say? | 
Train Day!
w/Rob Fair 6:30-8pm 1.5 hrs.
Jordan Osborn 6:15-7:15pm 1 hr.
Marcus Thorsen 6:30-7:15pm .75 hrs.
|  | 
| Rob Fair getting the Unit Coal Train 2A ready for his EB departure. Back to the Melrose Park Power Plant.
 | 
|  | 
| Jordan Osborn and Marcus Thorsen getting caught up. | 
|  | 
| I started recording and after we finished realized I didn't have the video setting on. Take two.
 | 
|  | 
| Watching last week's Layout Update video... | 
|  | 
| ...on the ipad. | 
|  | 
| Rob finishes running the EB Unit Coal Train 2A. I'll park this train this week at the Melrose Park
 Power Plant yard.
 | 
Tue, Oct 22, 2024
No train activity today.
Wed, Oct 23, 2024
Putting away the Unit Coal Train 2A
at Melrose Park Power Plant
|  | 
| Mainline Power back at the CNW Engine Facility for maintenance.
 | 
|  | 
| Coal loads all tucked away at the Melrose Park Power Plant
 | 
|  | 
| Coal is already unloaded and ready for another return trip to the Powder River Basin for more coal
 | 
Thu, Oct 24, 2024
Landscaping with Marcus - Part 8
Final episode of this 8 part series
to view the video please see Saturday's entry below
|  | 
| Hillside complete. Left of the Bridge Project Finished!
 | 
|  | 
| Beyond the wall I planted some trees. | 
|  | 
| While I was at it, I planted a few more on the other side of the street.
 | 
|  | 
| Then I filled them in to make it look "full". | 
|  | 
| Total time tonight, .75 hrs. | 
Fri, Oct 25, 2024
|  | 
| Up early to prep the pink areas by painting a green base color. | 
|  | 
| Painted and ready for grass. | 
|  | 
| That took about 20 minutes. | 
|  | 
| Came back later to spread the grass. | 
|  | 
| Cleaned it up. | 
|  | 
| Now it's time to run Priority Train #3 Commuter Train 1A
 | 
|  | 
| We take two laps without stops. | 
|  | 
| That whole session took 1 hr. 16 mins. | 
|  | 
| The Commuter Train 1A made it to Harvard on the Metra Northwest Line.
 | 
Sat, Oct 26, 2024
|  | 
| Adding safety lines to the roads. | 
|  | 
| The lines don't stay down by the adhesive, so I add Elmer's glue to cover and hopefully keep in place.
 | 
|  | 
| Added more safety lines to the road which leads to Uptown.
 | 
|  | 
| Using glue to keep those lines down too. | 
|  | 
| Time to run Priority Train #2 Mixed Freight Train 5B WB
 | 
|  | 
| I'll be using Power C2 as you can see in this photo. | 
|  | 
| And I'll be using Clipboard 2B as also shown in the photo above this one.
 | 
|  | 
| Pulling out the light power for Mixed Freight 5B | 
|  | 
| Dropping off the caboose at the end of the yard. | 
|  | 
| After putting the train together, I reattach the caboose to the rear of the train.
 | 
|  | 
| Here's a couple of pictures of the train. | 
|  | 
| Heading out of the yard. | 
|  | 
| Led by Power C2 the CNW SD45 and SD40-2. | 
to view YouTube video
Weekly Layout Update
Season 2024 Blog 534
Duration: 10:44 mins.
Description
Landscaping with Marcus - Part 7
Unit Coal Train EB
Landscaping with Marcus - Part 8 wrap up
Train Order Board
Priority Train No. 3
Metra Northwest Line
Commuter Train 1A WB to Harvard IL
 
No comments:
Post a Comment