Sun, Oct 6, 2024 thru Sat, Oct 12, 2024
Sun, Oct 6, 2024
Finishing up YouTube videos from last week...
Video 1
to view YouTube
Marcus - Part 4 - landscaping tips
working on Left of the Bridge Project
Duration: 14:25
Video 2
to view YouTube
Season 2024 Blog 531
Weekly Layout Update
Duration: 04:34
Just a little work tonight to get ready for tomorrow night...
The first priority train is the Unit Coal Train going WB to Powder River Basin. I need to remove the coal loads to prepare for the return trip to PRB. |
Coal loads emptied and in the tray. |
I moved the tray from the Melrose Park Power Plant to the tray storage above the PRB. |
Mon, Oct 7, 2024
Train Day!
w/Rob Fair 6-8pm 2 hrs.
Jordan Osborn 6-7:30pm 1.5 hrs.
Marcus Thorsen 6:15-7:15pm 1 hr.
Progress made tonight...
Rob Fair continues work on the intermodal well car containers. |
Jordan brought his guitar again to practice his new skill. |
Back at the workbench... Rob Fair glues in the tabs on the bottoms of the well car containers. |
Before Marcus calls it a day, we visit a bit. |
Marcus has one or two more sessions before we finish the "Left of the Bridge" project. This shows the sidewalks just before I glue them in. |
to view YouTube Video
highlighting
Landscaping with Marcus
Part 5
Duration: 09:42
Tools of the trade. Model RR that is. |
Final scene of progress tonight. Sidewalk glued in place. |
This week I plan to paint in the gutter for the sidewalk.
Tue, Oct 8, 2024
No train activity today.
Wed, Oct 9, 2024
to view YouTube Video Addendum
Train Order Board & Clipboards
Duration: 06:27
Also finished instructions for Yard Master PYUP GP50 #53 |
Power Assigned |
Clipboard 4D included with the others. |
Thu, Oct 10, 2024
Working on the gutters Left of the Bridge Project
Step 1: Tape off the edge |
Step 2: Paint in the gutter. |
Step 3: Remove the tape |
Step 4: Fix the roadway that heaved - weights used to hold the glue in place. |
Fri, Oct 11, 2024
FINALLY - starting new Train Order Board with Priority #1 Train
The Unit Coal Train 2A WB from the Melrose Park Power Plant in Illinois
to the Powder River Basin in Wyoming
The "Hawk" doing the work to get the WB Unit Coal Train 2A ready...
Just starting to build the WB Unit Coal Train 2A |
Pulling out the next set of cars. |
Just two more tracks to pull. |
All set for Main Line Power to be assigned. |
Watch video in tomorrow's entry
to view WB Unit Coal Train 2A on it's way to the
Powder River Basin in Wyoming
Now for the switching at the Powder River Basin East Yard...
Mainline Power C3 CNW C40-8 #8669 doing all the switching into the east yard. |
Just about finished. Just one more track to fill. |
The last three cars need to be switch and it's a wrap for the day. |
Job well done #8669. |
Here's a picture of the way the yard should be filled after arriving at the Powder River Basin East Yard. |
And here's a map of the same yard which matches the picture of the actual cars in place at the east yard. |
Time to fill the cars with coal. You can see I've filled 8 loads at the time of this picture. |
Now all the loads are filled. |
Next step:
Move these cars from the East Yard to the West Yard.
That prepares the cars for their return trip east to the
Melrose Park Power Plant.
Sat, Oct 12, 2024
Check out this video of the 1st Priority Train on the Train Order Board
to view YouTube Video
of the Weekly Layout Update
Duration: 07:37
No comments: