Sun, Dec 11, 2022 thru Sat, Dec 17, 2022
Sun, Dec 11, 2022
Still running Commuter Trains...
![]() |
| Power A3 with Commuter Train C3 Paperwork and work orders combined. |
![]() |
| This shows the Green dwarf signal which shows which track we arrive (Track 3). |
![]() |
| The far dwarf signal brings them into the Terminal. |
Mon, Dec 12, 2022
Train Day!
w/Rob Fair 6-8:15pm 2.25 hrs.
and Jordan Osborn 6-8pm 2 hrs.
![]() |
| Replenishing the Train Order Board Time to start on a new order. |
![]() |
| Ready to start our new session... |
![]() |
| Having trouble with the couplers coming apart. I tried to tape them together with electrical tape. |
![]() |
| As you can see, the tape came off. That didn't work. |
![]() |
| Meanwhile, Rob continues work on the station platforms at West Chicago West Line Station. |
![]() |
| Before Jordan leaves he stops by to see how Rob is doing. Making progress is what we want. |
![]() |
| Looking good, Rob. I will work on securing the sections Rob made tonight with some glue and some weights. |
Tue, Dec 13, 2022
![]() |
| I will continue tonight to secure what Rob started last night. |
![]() |
| Gluing the "asphalt" in place. |
![]() |
| Now it's time to wait for the weights. |
![]() |
| Waiting for more weights on the "asphalt" around the the station. |
![]() |
| Which brings me to the coupler problem discovered on the middle coach of Commuter Train 1D. |
![]() |
| I had to do some major repairs. 1st I had to remove the bolster washers from the trucks. 2nd I removed the couplers and replaced with Upper Shank couplers (which drops down the coupler). |
![]() |
| Checking the coupler connections of the middle car to the other two cars. |
![]() |
| Looks good connecting to the rear car. |
![]() |
| Also good connecting to the front car. |
Let's see how it runs tomorrow...
Wed, Dec 14, 2022
Quite a bit done on the RR tonight...
![]() |
| West Chicago Train Station Upgrades. Next step: Finish the station platform between the mainlines |
![]() |
| I also added a small parking lot around the old West Chicago station. |
Commuter Train 1D running down the middle
of Proviso Yard. When the train stopped, it decoupled!
UGH!
Duration: 00:00.31 sec.
![]() |
| I was going to change out the coupler, but my re- placement couplers were too short. I left in this coupler and made some other adjustments instead... |
Maybe a dab of glue will do ya'?
We'll have to wait and see after it dries.
Duration: 00:00.30 sec.
![]() |
| I cut out the cork bed for the station platform between the mainlines. |
![]() |
| Waiting for the Weights to do their job. |
Stay tuned for more updates tomorrow...
Thu, Dec 15, 2022
![]() |
| I'm amazed at all the stuff that has to come out during any projects we do on the layout. |
![]() |
| See what I mean? |
![]() |
| Tonight I'm going to work on some details at the West Chicago West Line Station. |
![]() |
| Natalie's Christmas present came in the mail today. Thanks Natalie! |
![]() |
| Back at the station... Painting the station platforms from west to east. |
![]() |
| Getting ready to install some lights. |
![]() |
| Lights in the secondary platform. |
![]() |
| Inside lights at the main station. |
![]() |
| Parking Lot and platform lights. |
Hopefully tomorrow I'll be able to wire these up.
Fri, Dec 16, 2022
Working on West Chicago Station
![]() |
| Getting out all the tools I'll need for tonight. |
![]() |
| All wired up and ready to check... |
![]() |
| I noticed the light in the right shelter was off center... |
![]() |
| You see it better in this picture. Also, the light in the station isn't working. |
I have a feeling when I bent the light fixture downward it caused a problem.
I'm going to switch out the station lights (platform/parking lot lights a.o.k.)
with a different set of LED lights.
Hopefully it will work better...
Sat, Dec 17, 2022
Some interesting changes already at West Chicago West Line Station...
![]() |
| Look what I found on the front porch this morning! Natalie's 2nd Christmas present! |
![]() |
| So, here's the current look at WeGo Station. I think the main station needs more lights. |
![]() |
| Another view of the lighting affect. Do you agree the main station needs more light? |
![]() |
| I'm going to add some lights under the soffits. I will be dropping the new lights down these two holes. |
![]() |
| You can see the two new lights under the soffits and the drop down wires. |
![]() |
| And WAH LAH! Doesn't that look a lot better? |
![]() |
| Another view... |
![]() |
| This is the total view of Light Section II. |
Jan and I ran a few errands tonight and we stopped by Hobby Lobby to get this:
![]() |
| These are 1/8" x 1/16" I will use as platform guides. |
![]() |
| Now to paint them a dark oak stain. |
![]() |
| Ready for installing on the RR. |
You will see these again on Monday night during our Group Train Session!
















































No comments:
Post a Comment