Sun, Apr 17 thru Sat, Apr 23
Sun, Apr 17, 2022
Happy Resurrection/Easter Sunday!
He is risen! He is risen indeed! Alleluia!
Before family comes at 5:30pm I'm going to drill holes in the steel beams for the safety support railings |
I also added the round Styrofoam cylinders to hide the electrical work |
Another view. |
The DVD Emily & Natalie gave me for my birthday arrived last week. I'm going to watch it today! |
It's about 60 minutes of train action. If you like trains, you'll like this video |
Live action from the DVD
Duration: 00:00:10 sec.
More live action from the DVD
Duration: 00:00:11 sec.
Mon, Apr 18, 2022
I had half a day today before TRAIN DAY! to work on the RR
I spent about 45 min. putting the "guard rails" up around the construction site |
Another perspective... |
Finished project. |
And now for TRAIN DAY!
w/Rob Fair 6-7:45pm 1.75 hrs.
Jordan stopped by just for a quick update.
My train crew! |
Rob Fair and I will spend the evening at the workbench. |
One of the drive shafts drops out of the socket when the truck moves too much. Need to be careful. |
I think we took the frame apart 3 times during the course of the evening. |
Final adjustments being made. |
Also repairing the hand rails at the front of the engine |
Tue, Apr 19, 2022
I meant to get some shots of the C40-8s running on the layout.
I didn't get it last night, but I did tonight.
Take a look...
How do you match two DC locomotives?
Duration: 00:00:31 sec.
More locomotive movements
Duration: 00:00:30 sec.
Rob repaired the hand rails in the front of the locomotive |
I took this picture because I liked the small light at the bottom of the unit in the middle |
Wed, Apr 20, 2022
No train activity today.
Thu, Apr 21, 20222
Prepping the Intermodal Train 2B ready for departure...
We start at the Train Order Board Finally we begin another series with Priority Train #1 |
Here's Intermodal Train 2B with Power B4 ready for dispatcher's signal at the Crossover #2 Control Point |
Here are the open tracks at Proviso Yard UP WB side vacated by the Intermodal Train 2B |
And here's the Cars in Consist updated sheet |
Fri, Apr 22, 2022
My sub assignment today begins at 10am.
I took some time early this morning to run the Intermodal Train 2B
The Intermodal Stack Train 2B on the move
Duration: 00:00:30 sec.
Intermodal Train 2B on the elevated tracks
approaching Oak Park Marion Street
Duration: 00:00:33 sec.
Intermodal Train 2B entering Global 1
Duration: 00:00:19 sec.
I forgot to Switch the Mainline switch to divergent so when I reversed direction, it went down the mainline and derailed. Not good. |
After dropping off EOTD car on the Locomotive Track
Pull forward than back to drop off end of Train 2B
into Global 1 Track 5
Duration: 00:00:09 sec.
Returning Light Power back to Engine Facility
Duration: 00:00:09 sec.
Light Power arrives at Proviso Yard UP Engine Facility
Duration: 00:00:29 sec.
Bringing Power B4 into the house
Duration: 00:00:19 sec.
After Mainline Power returns, the work begins at Global 1 taking off the trailers from Intermodal Train 2B |
After coming home after subbing, I spent some time on another project.
Check this out...
I'm going to wire up the billboard lights. |
I drilled the hole through the building and framework. |
I had to set the billboard in place and make sure it's level. I'm using Gorilla Glue to form a firm foundation. |
Another perspective. |
And now I wait...
Sat, Apr 23, 2022
Working on the billboard spotlights.
Check this out...
Here are the spotlights dangling before the install. |
I'm gluing the "conduit" to the middle upright. The mini-clothespins are holding it in place. |
I attached a 3V battery to the wires and this is what happened. The picture looks way brighter than in person. |
All the surrounding lights are off. |
Close up of one side... |
...and now the other side. |
Later this afternoon, I will try to add a resistor and connect it to a 6-9v power supply.
No comments:
Post a Comment