Sun, Mar 7, 2021 thru Sat, Mar 13, 2021
This Week's Goal Setting
1. More Weathering Locomotive Roster
This Week: Try one more CNW tandem...
2. Continue work on Clinton Ave. wall sections
This Week: Let's try to put the walls together and then paint them.
3. Laying more "asphalt" in the Industrial Park
This Week: Finish laying "asphalt" in north parking lot.
4. Begin work on the upper downtown area Melrose Park
This Week: Order additional sheets of the stone wall
Sun, Mar 7, 2021
Mon, Mar 8, 2021
Traveling to AZ for Mario & Susann's wedding tomorrow.
Moving Train Day to Friday this week...
Tue, Mar 9, 2021
Mario & Susann's wedding today.
Wed, Mar 10, 2021
Getting back from AZ today. Arriving at O'Hare at 6:06am so I'll probably have some time for trains today!
I'm going to try my hand at decoder installation. |
This was my Christmas gift from James & Natalie. These are the instructions. |
I've opened up another locomotive. Maybe I can put in three decoders this week. |
Thu, Mar 11, 2021
Lots of research on decoders...trying to figure this out for myself.
Fri, Mar 12, 2021
I went to B&G today and bought two more decoders. |
Train Day!
with Rob Fair & Jordan Osborn
planning on 6-8pm 2 hrs.
Gathering for Train Day! |
Rob Fair is going to work on laying "asphalt" in the Industrial Park. |
Here's the parking lot for the Melrose Park Power Plant. |
I'm working on the sound decoder for the F40PH I bought at B&G today. |
Jordan getting comfortable at the Control Tower. |
Rob Fair making progress in the Industrial Park. |
Rob's workspace. |
Rob Fair securing the "asphalt" to the base
Length: 00:00:15 sec.
Final approach before arriving at Chicago Terminal
Length: 00:00:06 sec.
Coming into the Station
Length: 00:00:29 sec.One last look at the sound decoder installation. |
I switched out the factory installed lights and will use LED lights instead.
I have soldered the resistors and will put shrink wrap before I install them.
I made a video of my FIRST EVER Decoder Install
Sat, Mar 13, 2021
Big day today!
Lots to report...
I had to go back to B&G and purchase the correct Decoder for the CNW GP7 #1518 |
Here's the weights Rob Fair put on to hold the "asphalt" in place. |
I made a video of my FIRST EVER Decoder Install
Length: 00:04:31 mins.
Here's the engine back at the Engine Shop all set up with DCC #1518. |
Now it's time to start another decoder project. |
I took off the weights and took some pictures of Rob's work from Friday night. |
Need to create between tracks asphalt section with tie overlapping. |
I thought I'd try to make some railings for the upper downtown Melrose Park stone walls. |
Preparing the toothpicks for painting. |
Getting ready to paint. |
All painted. |
This Week's Goal Progress Report
1. More Weathering Locomotive Roster
This Week: Instead of weathering I installed a decoder in CNW GP7 #1518
Next Week: Maybe weathering, but probably finishing two more decoders.
2. Continue work on Clinton Ave. wall sections
This Week: Let's try to put the walls together and then paint them.
Next Week: I'll try to get them cut and painted this week.
3. Laying more "asphalt" in the Industrial Park
This Week: Finished laying "asphalt" in north parking lot.
Next Week: Figure out where the far parking lot will go and get that done.
4. Begin work on the upper downtown area Melrose Park
This Week: Stopped by B&G and bought more wall parts.
Next Week: Work on filling in the missing wall sections.
No comments:
Post a Comment