Sun, Jan 24, 2021 thru Sat, Jan 30, 2021
This Week's Goals
1. Continue work on California Ave. Coach Yard entrance off Sacramento Blvd.
This Week: Maybe we'll try stringing up the wire cables on the utility poles?
2. More Weathering Locomotive Roster
This Week: Let's try to get one more CNW locomotive done!
3. Coming soon: Work on streets/parking lots in Industrial Park
This week: Let's try to cut the "asphalt" layer.
4. Continue work on Clinton Ave. wall sections
This Week: Paint and install the walls.
5. Lay track in both yards at Powder River Basin
This Week: Finish securing the track - not quite finished and then finish wiring up the switch for the 2nd track for engine storage (west end).
Sun, Jan 24, 2021
Today was an interesting day.
I wanted to switch the coal cars from empty to loaded and then move them from the East Yard to the West Yard.
First I had to get the paperwork ready.
I updated the Yard capacity for the West & East Yards at Powder River Basin |
I also added the switching column and the final destination column to the "Cars in Consist" Log |
Not sure what happened, but when I tried to run the locomotives they ran very "choppy".
I decided I would use some old Bachmann models to be my permanent switchers at Powder River Basin |
I don't like to do this, but these cars were all switched by hands, literally. |
I went back into my records and figured out how to reset the system.
I followed the instructions and reset the system. |
Then I checked to be sure the locomotives would respond and they responded perfectly. We're back in business. |
I may need to reset the decoders for each DCC locomotive,
but I'll check that tomorrow with Jordan at Train Day!
Mon, Jan 25, 2021
Train Day!
w/ Rob Fair & Jordan Osborn
scheduled from 6-8pm 2 hrs.
Wow! Lots to report tonight...
Let's jump right in...
Before the train crew gets here I wanted to install this ground throw. |
Rob Fair is working on the shell of the new F40PH locomotive that Carlos Baez installed a new sound decoder in last year and dropped off tonight! |
C'mon Jordan, how about a smile? |
There, that's better. |
Leaving Powder River Basin and crossing over to left hand run.
Length: 00:00:16 sec.
Unit Coal Train on its way to the Power Plant
Length: 00:00:17 sec.
Another trackside video of the Unit Coal Train
Length: 00:00:30 sec.
Rob Fair redirects his attention to the Industrial Park |
Rob's new work station. |
Jordan Osborn and I used the command station to program the new decoder in F40PH #151 |
The new F40PH #151
Length: 00:00:11 sec.
Another view of #151
Length: 00:00:12 sec.
Last view of the new F40PH #151
Length: 00:00:07 sec.
Rob working on the new intersection
Length: 00:00:15 sec.
Making progress on the intersection... |
While Rob & Jordan worked at the Industrial Park I decided I'd get ready to wire up the locomotive isolated track switch. You can barely see it if you look in the upper left corner of this picture. |
I'm soldering the wire to the rail on the tracks on the west end of the Powder River Basin |
The same action on another section of track preparing to wire up the switch for locomotive shut-off. |
Wrapping up the evening. |
Time for clean-up. Nice work on laying down the first layer of "asphalt" |
Tue, Jan 26, 2021
Time to get under the table and wire up the switch. I have my drawing ready and all my tools to get the job done. |
My drawing to make sure I wire this up correctly. |
Here's a video showing the engines in action...
or not...when you throw the switch.
Length: 00:00:21 sec.
Wed, Jan 27, 2021
No train activity today.
Thu, Jan 28, 2021
SPECIAL SESSION Tonight!
SPECIAL GUESTS: Cameron and Tony Passaglia
Also present: Jordan Osborn
Now before Tony & Cameron come over, Jordan is going to bring out the new F40PH #151 from the Chicago Terminal
RTA #151 F40PH Leaving Chicago Terminal
Length: 00:00:28 sec.
Approaching the crossover for left hand running
Length: 00:00:23 sec.
And here they come...
Length: 00:00:21 sec.
Cameron getting the coal train ready to return to the Powder River Basin
Length: 00:00:26 sec.
Jordan giving Tony a quick lesson on how to run the commuter train. |
Cameron prepares the Unit Coal Train for departure. |
Unit Coal Train running through Proviso Yard on way to PRB
Length: 00:00:29 sec.
Moving west toward Powder River Basin. Almost time for a crew change before night fall. |
Need to make a crew change before night fall.
Tony takes lead to make it happen.
Length: 00:00:30 sec.
Night fall and approaching Powder River Basin
Length: 00:00:30 sec.
Final approach to the Powder River Basin
Length: 00:00:30 sec.
And here we are in the East yard ready to return to the Melrose Park Power Plant |
Adios Amigos! Very fun night! |
To see full length video of tonight's events
Length: 00:04:04 min.
Fri, Jan 29, 2021
Working on blog and yesterday's YouTube video.
Sat, Jan 30, 2021
Spent quite a bit of time at the workbench today...
Plus some very special guests!
Special Guests: Jan Berg and Ida Zielke |
Special Guest: Jim Naatz |
Check my goals this week to keep on task. |
Look what came in the mail yesterday! A special on the Powder River Basin! |
Goal #4 Work on the Clinton Ave. wall. |
First, prepare the walls for painting. |
On to Goal #3 Laying the asphalt at the Industrial Park. Specifically, working on the new intersection. |
First, remove the old sidewalk. |
Next, cut out new pieces of "asphalt". |
Time to increase the active rolling stock. First, need to repair the cars waiting for inspection. |
This car has been waiting a long time for some TLC. I took this picture to show the dirt on the wheels came off in sheets. Gross! |
This pictures captures the BEFORE and AFTER Wheels on the left are done. Wheels on the right are coated with dirt. |
All clean! |
I had to switch out the couplers. Old McHenry couplers. |
New EZ-Mate Bachmann couplers. |
I also inspected two other cars now show on Track 3 at the Repair In Place Shop. |
The inspection sheets will be included with the engineer logs waiting for their test runs. The engineer will complete the log and return to the workbench inspection log for filing. |
This Week's Goals Progress Report
1. Continue work on California Ave. Coach Yard entrance off Sacramento Blvd.
This Week: Maybe we'll try stringing up the wire cables on the utility poles?
Next Week: We'll either work on stringing the cables or Goal #3
2. More Weathering Locomotive Roster
This Week: No more progress here.
Next Week: Let's try to get one more CNW locomotive done!
3. Coming soon: Work on streets/parking lots in Industrial Park
This week: Finished laying asphalt at the new intersection.
Next Week: Continue cutting and securing asphalt sections.
4. Continue work on Clinton Ave. wall sections
This Week: Prepared the walls for painting.
Next Week: Paint the walls and install in place.
5. Lay track in both yards at Powder River Basin
This Week: Finished securing the track and wiring up the switch for the 2nd track for engine storage (west end).
Next week: test out the track make sure it works and then ballast.
Nice progress, looking great ! ! ! !