Thursday, September 21, 2017

Week 163

Week 163

Sunday, September 10, 2017 thru Saturday, September 16, 2017

Sunday, September 10, 2017
Working on the UP Engine Terminal
First I need to take out the switch that leads into the terminal.

Now that the switch is gone, I can move to the next step.

I laid the new #6L switch where it belongs and now I will cut the cork to fit.

Once the cork is cut I'll get the glue/adhesive out and secure the cork to the base.

After the glue is secured, I'll put the cork on top and then use a rolling pin to flatten the glue.

Finally, I put a piece of plywood over the surface and then place weights on the plywood until the adhesive cures.

Monday, September 11, 2017
Continue work on UP Engine Terminal and Rob Fair working on Kedzie Avenue Station.


I let the weights stay on overnight and then removed for tonight's work.

Rob Fair will continue his work on making the roof shorter for Kedzie Avenue Station.

These are action shots!

Rob Fair looks all set and ready to go. Stool, head lamp, tools. What else do you need?

Here are the plans written in the orange book.

Making progress on UP Engine Terminal.

More progress.

Another view.

Just about finished with the UP Engine Terminal layout.

From another perspective.

With the tools at the end.

Meanwhile, back at Kedzie Avenue Station and Rob Fair.

Connecting the roof to the walls after a section of the wall has been removed.
Tuesday September 12, 2017
Finishing up UP Engine Terminal
Here's the UP locomotive fleet.

Another view.

And now, from the opposite direction.


Wednesday, September 13, 2017
Train Day! Just Jordan and me.
Jordan Osborn working on automobile placement.

Now to begin the CNW Engine Terminal.

After cutting the cork, I put down the adhesive.

Laying down the cork over the fresh adhesive.

Jordan Osborn secures the rolling pin to flatten the adhesive below the cork.

Jordan Osborn helps put on the weights to keep the cork secured to the adhesive.

Weights in place overnight for final curing of adhesive.


Thursday, September 14, 2017
Continue work at the CNW Engine Terminal
Now to add the track for the CNW Engine Terminal.

Progress.

I will extend the track to where the engines are resting.
Insert YouTube Video here.
File size too large to use from phone.


Friday, September 15, 2017
No train activity today.

Saturday, September 16, 2017
Only train activity today was driving the train at Kuipers Farmview RR.
Still having a great time, but it is a very long day!

No comments:

Post a Comment