Monday, April 24, 2017

Week 143

Week 143

Sunday, April 23, 2017 thru Saturday, April 29, 2017

Monday, April 24, 2017
Rob Fair couldn't make it tonight, but Jordan Osborn and Josh Jones did!

We had the closest thing to date to an operating session tonight.

We ran two complete test trains.

One westbound (powered by two CNW C40-8s) and the other eastbound 
(powered by two CNW SD40-2).
Both ran on Track 1.
We did pull a UP train but it stayed in the yard for Wednesday.

Here are a couple of pics to capture tonight.

This is the Dispatcher's Log that shows the two trains we ran.


And here are the two amigos showing their bag of tricks.
Jordan Osborn (left) and Josh Jones (right)

Tuesday, April 25, 2017
Carlos sent me some "What's on your workbench?"

Check these out...

Attaching lights to platform ceiling.

Combining all the wires and getting ready for hookup to power source.

The master craftsman at work...


All the lights glued down, all the wires soldered together for final connection, building glued to roof, really for install on the layout.
Wednesday, April 26, 2017
Train Crew Day!

Attended by:
Carlos Baez, Dean Hatzis, Jordan Osborn, and me.

Here's what went down...very exciting happenings!

We'll start with a video...
Length: 00:00:14s

Here's the work Carlos Baez did this week.
Ready for installation.

Station Platform light...ON!

First time this piece of equipment ever in use.
Dean Hatzis cleaning the wheels of UP AC6000.
Another Video...
Length: 00:00:27s

While Dean Hatzis (background) cleans the wheels on the locomotive, Carlos Baez (foreground) gets ready to "juice" the track cleaning car with GOO Gone.

Dean Hatzis and Carlos Baez get UP AC6000 online.

Pretty hard to keep up with the track cleaning car lead by UP SW1500.
I do have another video for you...

The track cleaning car in action.
Length: 00:00:22s

And another shot of the UP AC600 coming right at you...
Length: 00:00:34s

Jordan Osborn kept pretty busy today. He was running the track cleaning consist AND the UP AC600 with 23 cars.

Dean Hatzis finished marking the sidewalk sections.

And finally, our pride and joy - Kedzie Avenue Station Platform all lit up!

Another night shot.

Definitely need to do something about the ceiling floor joists.

Saturday, April 29, 2017
Jan and I were going to go to Chicago for the day, but we had a change of plans.
Instead, we went to Elburn and spent the day with Emily and Mabel, Henry, & Ida.

After supper, my goal was to light up Global 1.

See what you think...

First, I had to install one more tall light pole.
I drilled the hole, put in the plastic tube, prepared the extension rod and then...

I installed the unit in place.
This will illuminate the office area.

Here's an overall view of the four tall light fixtures in place.

It's hard to see, but here is the hookups under the table.
Each lamp is plugged into a terminal block which is wired to one of the transformer wires (direct).

Here are the tools I needed for the job as I worked under the table.

Finished product.
This looks much better in the picture than in real life.
It's much dimmer and more yellow in real life.

You can see the contrast in brightness in this picture.
The street lights look WAY brighter than the tall lights.
In this picture it looks pretty nice.
I wish the lights were brighter in Global 1.
I'll wait for feedback from the rest of you when you arrive this week.

See you then!

for Week 144.

No comments:

Post a Comment