Monday, September 26, 2016

Week 113

Week 113

Sunday, September 25, 2016 - Saturday, October 1, 2016

Sunday, September 25, 2016
The overhead lights from China came in this week.
I installed them at Geneva Station.
This week I plan to get the lights working.
Hopefully by Wednesday these will be lit.

Monday, September 26, 2016
Present: Curt Berg & Rob Fair
 Rob Fair, relaying the track due to multiple derailments at this corner.

 The master's hands at work.

 Working on realigning the switch.

 Cutting and reshaping the curve.

 Reconnecting the feeder wire.

Closeup of the feeder wire connection.

On Wednesday I'll take a video of the test train going over this section of track...

More to come...

Wednesday, September 28, 2016
TRAIN DAY!

Present (in order of appearance): Curt Berg, Carlos Baez, Jordan Osborn, Josh Jones
Absent: Ed Nelson, Dean Hatzis

As promised, here's the test train running over the tracks Rob Fair fixed on Monday.

Duration: 0.15s
Carlos Baez taking a close look from one direction.

Duration: 0.21s
Carlos taking another close look from the other direction.

And for the rest of the evening, here's what we did...
Dr. Carlos working on switch contact points.
He had to file them down so the train wouldn't jump the track.

Now for the test run.
Carlos Baez checking the train for QC.

 Jordan Osborn engineering the test train.

 Josh Jones removing a flip switch under the layout.

 Carlos flip flopping the trucks on a commuter coach car as a troublshooting option.

Josh Jones helping me with the Geneva Station Light installation.
More under the table transactions.

We finally figured out the light parameters for the street lights I bought from China.

The voltage rating should be 3V. I tried 16V and burned two of them out. Bummer!
Also, since the lights are LED they need to be polar sensitive.

The orange wires are positive.
The blue wires are negative.

If you hook it up any other way, they won't work.

Hopefully by the time the next blog comes out, you'll see Geneva Station in Lights!

Friday, September 30, 2016
Yes, I was able to wire up the lights.
Check out these videos...
Duration: 0.27s

Duration: 0.37s

And these pictures
 Here's a look at the Geneva Station Lights.

Here's the original switch I installed. The final installation will be planned for Sunday.

Saturday, October 1, 2016
I had to install a switch for the Geneva Station lights on the Central Control Tower Panel.
As I thought about it, I noticed the signage at the Central Control Tower needed to be updated.

So I did.
Here are the new signs...


South Power District
Intermodal Global 1
West Power District
Union Station



North Power District
Proviso Yard
East Power District
Industrial Park




 Our new and improved Central Control Tower

For the final finishing touches on the Geneva Station lighting see Week 114 entry for
Sunday, October 2, 2016.