Wednesday, January 22, 2020

Week 286

Sunday, January 19, 2020 thru Saturday, January 25, 2020

Key: NTA=No Train Activity

Sunday, January 19, 2020


Today I ran some test trains to see what speed each throttle would be set to for 1 lap equal to, or close to, 5 minutes.

Monday, January 20, 2020

Train Day!
with Rob Fair 6-7:30pm (1.5 hrs.)
Rob Fair came over for trains tonight.
Here he is getting ready to wire up the cars with lights.

As Rob worked on the wiring, I secured the crossover switches so they wouldn't neve cause electrical problems by switching which caused electrical shorts. I failed the troubleshooting so we came up with a different plan.
Crossovers on the mainline before entering Chicago Terminal.

Here you can see the pins I drove in to keep the switches in the proper position.

I also secured the railings on either side of the bridges over Milwaukee Avenue and Fulton Street.

This is a very interesting shot.
Rob is standing on the floor, but I'm also taking a picture of Chicago Downtown which happens to be on a 45 degree angle.
Here are some of the cars he wired up so they'd be lit up.

Back at the Terminal crossover I've got some braces to hold up the fences while the glue sets.

Then I went to the workbench and replaced the battery in the caboose.
I need to always remember to shut off the power so they don't run out of juice overnight.

After replacing the battery I tested the light...
Length: 00:00:07 sec.

The white strips are glue in the channels to secure the "EL" tracks in place.

Half is secured, now I need to secure the other half.
They line up pretty nice.

Tuesday, January 21, 2020

NTA

Wednesday, January 22, 2020

Train Day!
With Cam Passaglia and Jordan Osborn
4-5:30pm (1.5 hrs.)

Getting ready for the train show this Sunday...

First some videos...Cam behind the scenes...
Length: 00:00:07 sec.

And...the unit coal train coming around the bend...
Length: 00:00:18 sec.

Cam and Jordan getting ready for the operating session tonight.
Making sure our trains are running fine for the Train Show preparation this Sunday.

At the controls.

In the corner displaying the grove of trees.

A manifest train heading through Oak Park.
Length: 00:00:31 sec.

A view from the South Power District...
Length: 00:00:11 sec.

Cam working with the camera that was going bazurk!

Jordan Osborn keeping his hand on the throttle and his eyes on his train.
Or is he making sure Cam doesn't fall off the ladder.

A final video for your viewing pleasure...Chicago near north...
Length: 00:00:15 sec.

Thursday, January 23, 2020

NTA

Friday, January 24, 2020

NTA

Saturday, January 25, 2020

Getting ready for the Train Show tomorrow.
Mainly cleaning up different areas of the layout.
Check this out...
Here's my workbench BEFORE.
Pretty nasty.
Workbench AFTER
Nice and neat and tidy.

Grain Elevator/Melrose Park BEFORE

Grain Elevator/Melrose Park AFTER

Bellwood/Wheaton BEFORE

Bellwood/Wheaton AFTER

UP Global 2 BEFORE

UP Global 2 AFTER

Chicago Terminal Lake Street Bridge BEFORE

Chicago Terminal Lake Street Bridge AFTER





Sunday, January 12, 2020

Week 285

Sunday, January 12, 2020 thru Saturday, January 18, 2020

Key: NTA = No Train Activity for today.

Sunday, January 12, 2020

Had to move Train Day tomorrow to Train Day today!
Just like last week.
Rob Fair & Jordan Osborn
3-4:30pm 1.5 hours.

But first, Jordan and I stopped by the Midwest Train Show in Wheaton.
Here's what I found and what I spent:
Entry Fee: $7
5 trailers and 1 container @ $5 each: $30
5 pieces of Atlas Code 100 3' flex track: $20
Total Spent: $57

Rob Fair gets busy drilling holes for cars with lights.

Jordan shows his game face in recognition of the NFL playoffs happening today.

Remember that ball from last week?
After cutting it up and placing the pieces on the track, it appears it could use some touch ups.
See all the white showing through?

The first go around was painting the white parts bright green.
Too green we all thought after finishing step 1.

Step 2 was painting over the green with brown.
Much better.
Step 3 will be to reglue some of the loose pieces.
That should complete this project.

After drilling all the holes for the cars with lights, Rob begins connecting the wires.
But first we need to check the power supply.

After testing the power supply we found the 20V AC was too much. We tried the 9V AC and that was just right.
Next week we'll begin connecting the cars together in series and try to have this project finished by Train Show on Sun, Jan. 26.

If you look closely you can see a mark on Rob's forehead where he was wearing the headlamp (see previous picture).
It looks like a helmet mark so we did another tribute to NFL Playoffs with another "game face" pose.

Monday, January 13, 2020

NTA

Tuesday, January 14, 2020

Clean up day!
The first thing I did tonight was to fix the corner grove.
Here's the finished product.
You like?

A little tour of the changes made tonight.
Part 1
Length: 00:00:32 sec.

Tour continues...
Part 2
Length: 00:00:28 sec.

Wednesday, January 15, 2020

Train Day!
with Dean Hatzis & Jordan Osborn
4-5:30pm 1.5 hrs
Welcome back, Dean Hatzis!
After giving Dean the Grand Tour we got down to business.
Here's Jordan giving his typical greeting.

Dean will be working on the California Ave. Metra Maintenance building.
We're trying to figure out if we have enough windows and doors to do the job.

Time to call it a night.
Dean will take the mock up buildings and begin the project in the next few weeks.
Looking forward to seeing the end results.

Thursday, January 16, 2020

NTA

Friday, January 17, 2020

After subbing I was able to work on the RR
Working on the entrance to Global 2 on the west end of Proviso Yard.

I'll lay out the track and then cut out the cork and then secure the track to the cork.

Getting ready for the Train Show next Sunday afternoon.
Here's the Train Order Board for the Train Show.

I also made a dispatcher's log to coincide with this Train Order Board.

Saturday, January 18, 2020

NTA

Sunday, January 5, 2020

Week 284

Sunday, January 5, 2020 thru Saturday, January 11, 2020

NTA=No Train Activity for the day.

Sunday, January 5, 2020

Had to move Train Day tomorrow to Train Day today!
Rob Fair came over and worked on the RR with me from 3-4:30pm 1.5 hrs.
Rob Fair making marks where the holes will be drilled for the car light wires.

Here are the pencil marks Rob drew in to show the location of the lighted cars. 

While Rob worked on drilling the holes I worked on filling the holes in the grove of trees in this corner of the layout.

Here's Rob again working on the lighted car project.

Not sure why this turned out so yellow, but here is Rob inserting the wires through the drilled out holes for each lighted car.

Moving Commuter Cars from Chicago Terminal to California Ave. Metra Facility...
Length: 00:00:07 sec.

And here is my fleat of Metra Commuter Cars waiting at California Yard until it's time to return to Chicago Terminal.
Don't forget the one Amttrak train.

Monday, January 6, 2020

NTA

Tuesday, January 7, 2020

I didn't like the way the blue sky was visible through the forest glade so I did something about that tonight...check this out...
Here you can see the blue sky through the trees.
I will use the spray paint in the can on the right to mask the sky.

After romoving the front trees I spray painted the back ground and the forest floor.

Then I reinstalled the front trees and would love to know what you think about this new look.
You like?

Wednesday, January 8, 2020

NTA

Thursday, January 9, 2020

NTA

Friday, January 10, 2020

NTA

Saturday, January 11, 2020

After work, I was able to find some time to work on the RR

Now before you begin on today's blog, look back on Sunday's blog and notice the green ball in the background in the last picture of the day?

I cut up that green ball and used each piece for fill on the border of the layout in these pictures below:
I've just about finished stripping the foam ball down to the bare ball.

Done! Now to glue down the parts I cut away.

After that was finished and getting ready for the next step (painting the white parts), I worked on the Chicago Terminal Engine Yard. I added a switch which gave me one more track for another engine to store.
Here's the switch getting ready to install.

Switch installed and now just finish laying the track.

There you go. All set.