Sun, Nov 16, 2025 thru Sat, Nov 22, 2025
![]() |
| I found my UP SD40-2 2056! As you can see I need to add some details to finish this off. Maybe, someday, add a decoder as well. |
![]() |
| Same with this one... ...add a decoder to this fine running machine. |
![]() |
| Setting up the Sequence Train #1 Mixed Freight 5C with mainline power B3 UP SD40-2 2056 & 3571 |
Mon, Nov 17, 2025
Train Day!
w/Rob Fair 6-8pm 2 hrs.
Marcus Thorsen 6:15-7:15pm 1 hr.
![]() |
| Using Dremel tool to make more room for the headlight |
![]() |
| We had some initial problems with power tonight. Not sure what caused the problem, but we were back in action shortly after this photo. |
![]() |
| Getting ready for our final test when... |
![]() |
| ...Marcus arrived after an hiatus of about 2 months. |
![]() |
| Marcus checking progress on the RR. |
![]() |
| Rob had several questions for "the professor" after some time away with his grandson and Boy Scouts |
![]() |
| Making the first lap for Sequence Train #1 the Mixed Freight 5C train heading EB |
![]() |
| Preparing to drop off the last 7 cars of Mixed Freight 5C Train at the Industrial Park Transfer Track (IP TT) |
![]() |
| Backing the train into the drop off location. See the Weekly Layout Update Video for more action from tonight's session. |
![]() |
| Rob Fair proudly shows off his newly installed decoder and power extender locomotive... CNW C40-8 8526 |
Tue, Nov 18, 2025
I finished running Sequence Train #1
Mixed Freight 5C Train EB with
B3 Power UP SD40-2 2056 3571 DC
![]() |
| Power B3 UP SD40-2 2056 3571 back in UP Engine Facility storage track 3 |
![]() |
| Also brought in two cabooses |
![]() |
| The end of Mixed Freight 5C |
![]() |
| The front of Mixed Freight 5C |
![]() |
| One more look at the Industrial Park Transfer Track IP TT |
Wed, Nov 19, 2025
![]() |
| Sequence Train #2 Metra Commuter Train 1A Power A1 F40PH 132 UP Northwest Line to Harvard IL |
![]() |
| Oops! We have a problem. A lone locomotive... |
![]() |
| ...and the first car off the tracks and on the floor... |
![]() |
| ...& the remaining two cars of the commuter consist. |
![]() |
| I gathered the parts and will plan on putting this model back together to finish the run to Harvard. |
Thu, Nov 20, 2025
Bringing light to the secondary workbench
![]() |
| This could take more than I expected. Some of the parts needed were broken off. May need to order new trucks. |
Fri, Nov 21, 2025
![]() |
| Finishing our trip to Harvard with only 2 cars. Once the new truck arrives for the other commuter car I will add it to this consist. |
![]() |
| Metra Commuter Train 1A arriving Harvard on the Northwest line. |
![]() |
| Arrived - Harvard IL |
![]() |
| My new location for commuter car repairs. Not enough tools at the other location. |
Sat, Nov 22, 2025
Getting the two workbenches properly filled with upcoming projects...
![]() |
| There are two projects ready to go at the secondary workbench. 1.) CNW C40-8 #8501 need to install a power Xtender. 2.) CNW SD40-2 #6935 need to install a new decoder and power-Xtender. |
![]() |
| To work at the bench you need to sit at the stool. It may be too low for some. If that is the case, we'll move that project over to the primary workbench. |
to view the Weekly Layout YouTube Update
Duration: 12:56 mins.
Description:
*Found missing UP SD40-2 #2056 running Mixed Freight 5C EB
*Still on Sequence Train #1
*Dropping off 7 cars at Industrial Park Transfer Track
*Signal changes on EB mainline track 2
*Watching on monitors
*Entering Proviso Yard WB Union Pacific yard
*Oops! I left the road crossing lights running
*Sequence Train #2 - Metra WB Northwest Line Commuter Train 1A to Harvard IL
*CRASH to the floor! 😬
*Finished running Sequence Train #2 Metra Commuter Train 1A Northwest Line to Harvard IL
*Thanks a lot for watching!
Especially this far into the video 😁
































No comments:
Post a Comment