Monday, June 2, 2025

Week 566

Sun, Jun 1, 2025 thru Sat, Jun 7, 2025

Sun, Jun 1, 2025

Working the Train Order Board.
This time getting Priority Train 1 on line 
The Unit Coal Train switched by SW7 CNW SD40-2 #6922

Empty Yard at the Melrose Park Power Plant

Unit Coal Train 2A waiting for road power

And the back of the train on the mainline waiting
for road power

That part took about 20 minutes.

Mon, Jun 2, 2025

Up early to get the mainline locomotive power connected to the newly constructed Unit Coal Train 2A

Running the first "Solo" train from the Train Order Board

Connecting Power B2 to the consist.

B2 Power is on Track 2 next to the Switcher GP50 #53

Road Power B2 connected to Unit Coal Train 2B ready
for its Westward journey to the Powder River Basin
in Wyoming.

TRAIN DAY!
Field Trip to Dave's place in Elburn IL
Dave has been working on his N scale layout and continues to make improvements

Grain elevator. Marcus has added his scenic touch.

Incredible Roundhouse complete with lighting.

Over 200 locomotives in storage and on the layout.

Huge classification yard.

Fully scenic drawbridge in
OPEN position.

Power plant.

Here's the crew l.to r.
Dave, Jordan, Marcus, Rob

Very impressive!

I did take some videos which you can view in the Weekly Layout Update below:

Tue, Jun 3, 2025

Rob Fair has been working on the tender for this
steam locomotive. He found screws to fit the openings.

Running the Unit Coal Train 2B WB 5 laps to
Powder River Basin, Wyoming

Unit Coal Train 2B WB led by two UP SD60Ms...

...the middle of the train...

...and the end of the train.

Final lap.

HOLD at the entrance to Powder River Basin.

I will need to clear this train before running the next Sequence Train.

Wed, Jun 4, 2025

Jordan and I went to Lombard Hobbies to pick up two items I put on order
Decoder Buddy and a SoundTraxx decoder




I asked the clerk if they had any CNW C40-8 locomotives.
He did some digging and found one on ebay...


I found another one too.

This is the one the clerk found.

Here are some other CNW locomotives...$284.99

...and a few more $204.99.

This is why we went to Lombard Hobbies...
...to pick up these two items.

I came home and switched the Unit Coal Train 2A into the PRB East Yard

Bringing in the Unit Coal Train 2A with Road Power B2.

Road Power waits on side track. PRB switcher takes
over switching duties.

Getting ready to begin switching the mainline train
to the empty East Yard

One leg is finished...

Two legs are finished...

Just three more cars to switch.

Half way through loading the cars with coal.

Another view.

DONE!

I finished off tonight installing the items I picked
up at Lombard Hobbies.

Switching the Unit Coal Train 2B and installing the
Decoder Buddy and SoundTraxx decoder took 1 hour.

Thu, Jun 5, 2025

I printed out these two documents so I can finish
installing the decoder in the Metra F40PH #132

Fri, Jun 6, 2025

No train activity today.

Sat, Jun 7, 2025

Final video recordings for Weekly Layout Update

to view YouTube
Weekly Layout Update
Duration: 07:46 mins.

No comments:

Post a Comment