Sun, Jun 1, 2025 thru Sat, Jun 7, 2025
Sun, Jun 1, 2025
 |
Working the Train Order Board. This time getting Priority Train 1 on line The Unit Coal Train switched by SW7 CNW SD40-2 #6922 |
 |
Empty Yard at the Melrose Park Power Plant |
 |
Unit Coal Train 2A waiting for road power |
 |
And the back of the train on the mainline waiting for road power |
 |
That part took about 20 minutes. |
Mon, Jun 2, 2025
Up early to get the mainline locomotive power connected to the newly constructed Unit Coal Train 2A
 |
Running the first "Solo" train from the Train Order Board |
 |
Connecting Power B2 to the consist. |
 |
B2 Power is on Track 2 next to the Switcher GP50 #53 |
 |
Road Power B2 connected to Unit Coal Train 2B ready for its Westward journey to the Powder River Basin in Wyoming. |
TRAIN DAY!
Field Trip to Dave's place in Elburn IL
Dave has been working on his N scale layout and continues to make improvements
 |
Grain elevator. Marcus has added his scenic touch. |
 |
Incredible Roundhouse complete with lighting. |
 |
Over 200 locomotives in storage and on the layout. |
 |
Huge classification yard. |
 |
Fully scenic drawbridge in OPEN position. |
 |
Power plant. |
 |
Here's the crew l.to r. Dave, Jordan, Marcus, Rob |
Very impressive!
I did take some videos which you can view in the Weekly Layout Update below:
Tue, Jun 3, 2025
 |
Rob Fair has been working on the tender for this steam locomotive. He found screws to fit the openings. |
 |
Running the Unit Coal Train 2B WB 5 laps to Powder River Basin, Wyoming |
 |
Unit Coal Train 2B WB led by two UP SD60Ms... |
 |
...the middle of the train... |
 |
...and the end of the train. |
 |
Final lap. |
 |
HOLD at the entrance to Powder River Basin. |
I will need to clear this train before running the next Sequence Train.
Wed, Jun 4, 2025
Jordan and I went to Lombard Hobbies to pick up two items I put on order
Decoder Buddy and a SoundTraxx decoder
I asked the clerk if they had any CNW C40-8 locomotives.
He did some digging and found one on ebay...
 |
I found another one too. |
 |
This is the one the clerk found. |
 |
Here are some other CNW locomotives...$284.99 |
 |
...and a few more $204.99. |
 |
This is why we went to Lombard Hobbies... ...to pick up these two items. |
I came home and switched the Unit Coal Train 2A into the PRB East Yard
 |
Bringing in the Unit Coal Train 2A with Road Power B2. |
 |
Road Power waits on side track. PRB switcher takes over switching duties. |
 |
Getting ready to begin switching the mainline train to the empty East Yard |
 |
One leg is finished... |
 |
Two legs are finished... |
 |
Just three more cars to switch. |
 |
Half way through loading the cars with coal. |
 |
Another view. |
 |
DONE! |
 |
I finished off tonight installing the items I picked up at Lombard Hobbies. |
 |
Switching the Unit Coal Train 2B and installing the Decoder Buddy and SoundTraxx decoder took 1 hour. |
Thu, Jun 5, 2025
 |
I printed out these two documents so I can finish installing the decoder in the Metra F40PH #132 |
Fri, Jun 6, 2025
No train activity today.
Sat, Jun 7, 2025
Final video recordings for Weekly Layout Update
to view YouTube
Weekly Layout Update
Duration: 07:46 mins.
No comments:
Post a Comment