Sun, Dec 31, 2023 thru Sat, Jan 6, 2024
Sun, Dec 31, 2023
I scratched trying to use JMRI to change the decoder in the Metra F40PH #138.
Instead, I used the command station -
figured it out
- and now have completed the renaming of the decoder.
I've completed my work on the Metra locomotives... except one more... |
This is the final locomotive that's getting a N scale sound decoder without using a decoder harness. |
I've wired up the motor and the tracks. Now it's time to work on the lights. |
Maybe I'll finish this puppy up tomorrow...
Mon, Jan 1, 2024
HAPPY NEW YEAR!
Inside the shell working on the LED lighting. With FLASH. |
Same picture without FLASH. |
And finally, here we have both front and rear lights in place. Next step: wire them up and test them out. |
One more picture before calling it a night. |
I found out the directions are wrong.
Tomorrow I will switch the motor wires around so the lights will be correct.
Tue, Jan 2, 2024
It looks like a pencil, but it's not. It's the chamber I made for the fiber optics back lights. |
This picture shows the common (+) block. |
Here's all the connections from the decoder to the rest of the locomotive. They are used for the motor, track power, and lights. |
I am just about ready to place the shell back on and give it a test run. |
Oops! After the test run I found one of the lights was not illuminating. Back to the workbench to fix the fiber optic which broke (which I didn't know) when I was installing it. |
Later that day...
Becca wanted to go to the basement to the see the trains...
When we got there she just wanted to work on crafts.
Using what we had, this is what she made:
Wed, Jan 3, 2024
Special Guests arrive from Vietnam to visit the RR...
I'm showing them the Google Maps picture of downtown Melrose Park. |
Becca continues craft project. |
More pictures around the layout. |
Lots of family gathering around the layout. |
My brother, Neal, is one of my biggest fans. |
Neal's brother-in-law, his daughters, and mother-in-law. |
Neal's mother-in-law and Neal's wife, Geena. |
Geena's dad. |
Geena's brother, his wife, and twin daughters. |
Special assistant to Geena who also made the trip to the USA. |
Thu, Jan 4, 2024
Fixing the last of the Metra Fleet.
F40PH 130 DC analog to DCC sound.
Fixing the fiber optic cable that broke off both back lights...
I had to redrill the hole that I will use for the new fiber optic tube. |
I used a pin vise and very small drill bit to puncture the shell |
I had to do the same on each side. |
Good shot of the pin vise and drill going through the front of the locomotive shell. |
This picture shows the fiber optic tube in stalled. |
And where the fiber optic is installed in the light tube. |
The fixed back lights using fiber optic tubes on the new & improved Metra F40PH 130 locomotive. |
Fri, Jan 5, 2024
Not a lot of activity today...
I did run the Unit Coal Train - finished lap 2.
Sat, Jan 6, 2024
Up early to play with trains...
Field Trip to Elburn IL
Tom Stover's basement HO Scale Model Train Layout |
Post WW2 era Steam and early diesel F7s |
Very nice layout - very meticulous |
Tom loves operations - he uses a card system where each car has an assignment that takes about 4 cards to complete. |
Time for the first episode of the New Year
Season2024Blog492 (S2024B492)
Great. Enjoyed all the pics. Will get them sent to all the VN clan. Did you get the lights fixed?
ReplyDelete