Sun, Jun 25, 2023 thru Sat, Jul 1, 2023
Sun, Jun 25, 2023
No pictures today, but I finished the EB Commuter Train 1C from Geneva to Chicago
Mon, Jun 26, 2023
Train Day!
w/Rob Fair & Marcus Thorsen
6-8pm 2 hrs.
Marcus brought some farm animals to enhance the scenery on the layout. |
Checking for clarity in a prayer book by D.L. Moody. |
Rob Fair getting ready for our session. |
Marcus placed the telephone poles in logical sequence. |
Rob begins the session. His job tonight will move the full coal loads from the East Yard to the West Yard. |
Meanwhile, back at Proviso Yard, Marcus continues to attach the new wall partitions. |
He is adding trim pieces here. |
Rob prepares to start moving cars. |
Checking paperwork and getting things in order. |
We're on the move! |
Marcus brought some more switches. These two will need to be replaced by the ones shown on the top of this photo. |
Meanwhile, back at Proviso, Marcus gets a ground level view of the wall partitions. It looks quite different at the different angles. |
Rob completes the mission. All cars now located properly at the West Yard ready for departure to Melrose Park Power Plant. |
Tue, Jun 27, 2023
This morning I updated the paperwork for Sat, Sun, Mon Train Operations.
I also added David & PJ Morlock to the Engineer Logged Minutes Report.
Tonight I put in the new switch at the UP Engine Facility.
BEFORE I'm going to remove this straight piece of track... |
Straight piece of track removed... |
Switch added. |
Then I need to rewire the feeder wires. |
Feeder wires soldered to the rail sides. |
Mission Accomplished tonight!
Wed, Jun 28, 2023
More track work, this time at the Powder Rive Basin - East Yard
Marcus brought over some used HO Scale switches. Here they are overlaid on the ones that need to be replaced. |
Removing the initial switches. |
Laying out and installing the "new" switches. |
Thu, Jun 29, 2023
Today I helped Rob Fair move a used water softener out of his basement.
Since we were in his basement, I took some pictures of his layout.
Rob's layout is similar to mine. It is a dog-bone style with two loops on either side. |
He models the PRR. This side includes Horseshoe Curve. The inside is the town where his family lived growing up. |
Looking down the layout from the other loop. The room on the other end is a bathroom with a very cool wall. See next picture. |
When you're sitting on the throne, this is what you see on the wall in front of you. |
Pretty ingenious!
Nice work, Rob!
Fri, Jun 30, 2023
Producing Monthly Layout Update today...
Click here to view Jun 2023 Layout Update Video
😀BUT, I did a little track work on the switches at the Powder River Basin East Yard
Installing new switches and cutting new yard leads. |
Close up of inserting small track pieces shorter than the piece tracks available for purchase from Atlas. |
Sat, Jul 1, 2023
More work on the switches at Powder River Basin East Yard...
The two switches are in and attached to the yard tracks. |
Now it's time to install the ground throws. |
Really hard to see the small hole I need to drill in the ground throw rod. But this magnifying glass did the trick. Also, note all the tools needed for this project. |
Both ground throws installed on both switches. |
Checking their operations. |
Painting the main line green with the guard rail installed. |
Painting the divergent line RED with the other guard rails installed. |
Another project successfully completed.
I also ran two locomotives over the new switches to make sure there was not stopping or derailing.
Result: SUCCESS!
😀
No comments:
Post a Comment