Sun, Feb 21, 2021 thru Sat, Feb 27, 2021
This Week's Goal Setting
1. More Weathering Locomotive Roster
This Week: Making an attempt at some of the CNW roster.
2. Continue work on Clinton Ave. wall sections
This Week: Waiting to stop by B&G to get more supplies. So I can paint all at once.
3. Laying more "asphalt" in the Industrial Park
This Week: Try to get as much done as possible...
Sun, Feb 21, 2021
Length: 00:00:40 sec.
Length: 00:00:33 sec.
End of Train Device (EOT) or
FRED (Flashing Rear End Device)
Length: 00:00:07 sec.
Later that night...
Finally, after three weeks, I'm going to weather the C40-8s from the CNW roster. BEFORE |
AFTER |
Another view of AFTER |
And still another view of AFTER |
I'm thinking it's not weathered enough? |
Still looks pretty new... |
Mon, Feb 22, 2021
Train Day!
with Rob Fair 6-8pm 2 hrs.
Jordan needed a break after all the work this
weekend helping his Dad.
Finishing touches on the entrance to the California Avenue Coach Yard at Sacramento Blvd. |
Our goal tonight is not written out. I decided,
last minute, that we would work out the kinks
on all the switches in this stretch.
Rob Fair is checking clearance on one of the cars that has a low riding truck. |
The switches needed quite a bit of work on clearing the ballast that got stuck between the switch gear. |
This picture was taken from the monitor at the Central Control Tower. |
Rob Fair with his power tool. Working our way down the line... |
I didn't realize I took a ".gif" picture which puts motion into a regular picture. Rob is doing our final test of this area. It was successful, by the way... |
After the "switch stretch" was finished we headed to the switch to Powder River Basin... |
Somehow the arm was removed from the base... Another successful fix by Rob Fair! |
Finally, our last "fix it" project. |
For some reason, the steam excursion would derail every time where Rob is sitting. |
Rob ended up filing down some solder that was over the rails. The lead wheels must have jumped the track and the drive wheels followed. |
Tue, Feb 23, 2021
I've added another "unofficial" goal this week. Fix the front coupler and the pilot on Metra F40PH #132. |
I also updated one more week on the timeline. Let's see...just 40 more to do. |
If each week takes about 20 minutes that's a total of 800 minutes or 13.5 hours to go.
UGH!
Wed, Feb 24, 2021
One more done. 39 to go. |
If I don't update two each week I'll never make any progress since every week I add another week.
UGH!
It's okay, I'll keep plugging away!
Thu, Feb 25, 2021
I stopped at B&G today so I could start working on Goal #2. Hopefully I'll get everything painted this week. |
Items Purchased:
Flat Black Acrylic Paint $2.50 tax $0.21
Rail Joiners $4.50
30104 Street Level Blank Walls $7.99
30114 Cornices/Fancy $8.99
30106 Dock Level Freight Doors $9.99
Tax $2.67
Total: $34.14 + $2.71 = $36.85
Fri, Feb 26, 2021
Time for more weathering of locomotives. BEFORE |
This is the acrylic paint I bought from B&G yesterday. |
AFTER weathering. |
I also did three more inspections/repairs of rr cars. |
This one needed trucks and couplers. |
Here are the three cars ready for a test run. |
Sat, Feb 27, 2021
This Week's Goal Progress Report
1. More Weathering Locomotive Roster
This Week: Finished CNW C40-8s (see Sun, Feb 21, 2021) also completed Metra #132 (see Fri, Feb 26 entry).
Next Week: Keep going...
2. Continue work on Clinton Ave. wall sections
This Week: Stopped by B&G to pick up supplies (see Thu, Feb 25, 2021).
Next Week: Let's try to put the walls together and then paint them.
3. Laying more "asphalt" in the Industrial Park
This Week: No progress.
Next Week: We'll see where next week takes us...no promises.
No comments:
Post a Comment